BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in New Ulm, Minnesota. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

A. 20th Street Lift Station 1. Remove four (4) existing centrifugal pumps. 2. Furnish and Install four (4) new dry pit submersible pumps. 3. Remove and replace process piping and valves. 4. Install new VFDs and electrical and controls for new pumps. 5. Other miscellaneous work as shown on the plans. B. Primary Pumps 1. Remove two (2) existing primary pumps. 2. Furnish and install (2) new rotary lobe pumps and grinders. 3. Remove and replace process piping and valves. 4. Install new electrical and controls. 5. Other miscellaneous work as shown on the plans. C. Thickened Sludge Pumps 1. Remove two (2) existing thickened sludge pumps. 2. Furnish and install (2) new rotary lobe pumps. 3. Remove and replace process piping and valves. 4. Remove existing equipment, piping and valves as noted. 5. Install new VFDs for the pumps and miscellaneous electrical and controls. 6. Other miscellaneous work as shown on the plans. D. Aeration Basin Diffuser Replacement 1. Remove and replace all membrane diffusers in the existing aeration basins. 2. Dispose of all used diffuser membranes. 3. Other miscellaneous work as shown on the plans. The work included in the project shall include the furnishing of all required labor and materials for a complete and operable electrical system as indicated on the accompanying drawings and as required by the project manual inclusive of all appurtenances not specifically shown or covered by the specifications but required for complete operation of the electrical system as defined in the documents. The work shall also include the testing, adjustment, start-up and troubleshooting of the electrical equipment and the training of the Owner's operating personnel in its operation and maintenance. It shall be the responsibility of the Contractor to furnish a complete and fully operating system. The Contractor shall be responsible for all details which may be necessary to properly install, adjust and place in operation the complete installation. The Contractor shall assume full responsibility for additional costs which may result from unauthorized deviations from the contract documents.

Award

Water / Sewer

$1,628,870.00

Public - City

Renovation, Site Work

52

1

2

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
48
Bidding Soon
1,164
All Active Projects
394
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 15, 2020

January 14, 2021

November 10, 2021

img_map_placeholder

20th S St, New Ulm, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.