Demolition, site work and new construction of a municipal facility in New Bedford, Massachusetts. Completed plans call for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.

Bottom of CAD Cell No. 4 & North Terminal Expansion Project. The project consist of construction of Bottom of CAD Cell No. 4 & Capping of Lower Harbor CAD Cell in conjunction with construction North Terminal within New Bedford's lower harbor. Good morning, Intent of the Contract is to provide for the construction and completion in every detail of the Work. The Contractor shall complete the Work to the satisfaction of the Engineer at the prices set forth and agreed upon. Where portions of the Work are described in general terms, but not in complete detail, the best general practice shall be followed. Only materials and workmanship of best standard quality shall be used. The Contractor shall, unless otherwise specified, furnish all labor, superintendence, materials, tools, equipment and incidentals necessary to complete the Work in a proper, thorough, and workmanlik manner. The NBPA reserves the right at any time during the progress of the Work to make alterations to, deviations from, additions to, and deletions from the Contract Drawings and Specifications. Such changes shall not invalidate the Contract nor release the Surety. The Contractor agrees to accept the Work as changed, the same as if it had been a part of the original Contract. Such changes will be authorized in writing by the Engineer. The Contractor shall accept as full compensation for Work, except as specified in paragraph "B" and paragraph "C" of this Article, the Contract unit prices stipulated in the Contract for the actual quantity of Work provided in an acceptable manner. Such changes shall not invalidate the Contract, nor any part thereof. Wherever an alteration, deviation, addition, or deletion involves a change in the nature of design or in the type of construction which increases or decreases the cost of performance of the Work or requires the Contractor to furnish materials or provide work of a kind not susceptible of classification for payment under any of the items scheduled in the Bid, the NBPA and the Contractor may enter into Supplementary Agreements covering the Work to be done and the manner and method of payment therefor. If the Contractor and the NBPA disagree on increased or decreased costs, the changes shall be by a Change Order. If the changes, in the opinion of the Engineer, are of sufficient magnitude as to require additional time to complete the Contract, such time adjustment may be made in accordance with the provisions of Article 6.08

Award

Municipal

$27,943,800.00

Public - City

Demolition, New Construction, Site Work

94

27

38

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
201
Bidding Soon
2,285
All Active Projects
1,083
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2022

May 30, 2022

img_map_placeholder

Multiple Locations, New Bedford, MA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.