Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a water / sewer project in King Salmon, Alaska. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Award Details Contract Award Date: Sep 10, 2021 Contract Award Number: 140P2021C0086 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 187196790 Contractor Awarded Unique Entity ID (SAM): T436FJM2DXB9 Contractor Awarded Name: AHTNA ENGINEERING SERVICES, LLC Contractor Awarded Address: Anchorage, AK 99503-5677 USA Base and All Options Value (Total Contract Value): $2736904.63 Estimated Price Range: Between $1,000,000 - $5,000,000 Period of Performance: 08/01/2021 to 11/30/2022 MBE (15.1%), WBE (6.9%), SBE (100%) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Brooks Camp Septage Treatment and Disposal System, Katmai National Park and Preserve, KATM 238414 This project is located at Brooks Camp, within Katmai National Park & Preserve. This project will provide for closure of the existing LLC and development of a new compliant wastewater treatment and disposal site for both the vault toilet raw sewage and the septic tank septage generated at the Brooks Camp developed areas. The new Brooks Camp Sewage Sludge Lagoon will be located adjacent to the Valley of Ten Thousand Smokes Road (Valley Road) in the vicinity of the Mile 1.8 Pit historic borrow site. The proposed site will require approximately 1.65 acres of clearing, grubbing, and grading for construction site access. The proposed lagoon will require approximately 3,100 cubic yards (CY) of unclassified excavation. The proposed borrow pit source for lagoon embankment materials is the Mile 5 Pit quarry site. Mile 5 Pit is an active borrow pit which has been previously utilized for roadway materials during periodic Valley Road maintenance. The Mile 5 Pit quarry is approximately 3.2 miles from the Mile 1.8 Pit NE lagoon site, as the location names suggest. The National Park Service (NPS) plans to furnish the material mining rights such that the contractor may extract, crush, and sort the required amount of embankment materials within the Park at no additional charge for royalties. The contractor's price for earthwork materials will be limited to the extraction, sorting, crushing, hauling, and final installation. The lagoon embankments will require approximately 4,800 CY of additional select borrow fill from Mile 5 Pit. Participants will meet NPS staff at the King Salmon Airport at 10:45 AM local time on Thursday, May 20, 2021. The NPS will shuttle the offerors from King Salmon to the project site at Brooks Camp, and then back to the King Salmon airport by 4:00 PM local time. This will allow those returning to Anchorage, Alaska, to make the 4:40 PM local time return flight out of King Salmon. The offerors who plan on attending shall notify the NPS to allow us to plan. Attendance will be limited to no more than two (2) individuals from each offeror.
Award
Water / Sewer
$2,736,904.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 17, 2021
August 1, 2021
To Be Determined, King Salmon, AK
Related To This Project
King Salmon, AK
--
King Salmon, AK
--
Saint Paul Island, AK
Bid Date: Mar 26 2021
Anchorage, AK
Bid Date: Feb 10 2022
Anchorage, AK
Bid Date: Dec 21 2021
Metlakatla, AK
Bid Date: Aug 18 2021
Soldotna, AK
Bid Date: Mar 08 2022
Anchorage, AK
Bid Date: Feb 22 2022
Anchorage, AK
Bid Date: Mar 09 2022
Venetie, AK
Bid Date: Jun 03 2021
Valdez, AK
Bid Date: Mar 07 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.