BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Phoenix, Arizona. Conceptual plans call for site work for a water / sewer project.

As of August 3, 2022, information regarding award and award date has not been disclosed. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: The City of Phoenix is seeking a qualified engineering consultant to perform an alignment study and to design and prepare construction drawings for a relief sewer project generally along Camelback Road from 31st Avenue to 29th Avenue, 31st Avenue from Camelback Road to Bourgade Catholic High School, along the north boundary of Bourgade Catholic High School from 31st Avenue to 35th Avenue, and 35th Avenue from the north boundary of Cielito Park to Hazelwood Street. Work may also include construction administration and inspection services. Conduct an alignment study for the Relief Sewer Project described above. Present the recommended alignment results to the City for discussion and selection. Perform a sewer capacity analysis. Determination of and assistance in obtaining any required easements and licenses. Coordinate with the City of Phoenix Real Estate Division as necessary for the Project. Perform data collection and field survey as necessary for the Project. Perform utility investigations and coordination to prevent conflicts with final design. Perform detailed geotechnical investigations including corrosion of potential soils. Provide public information services based on Project impacts. Prepare design concept report and design documents including technical specifications, special provisions, and drawings for constructing the Relief Sewer Project. Prepare preliminary and final construction cost estimates. Prepare project schedules and hold progress meetings and workshops as needed to complete the work. Coordinate with the City of Phoenix Street Transportation Department and other outside agencies as necessary for the Project. Coordinate with developer installing sewer along Hazelwood west of 35th Avenue. Assist City in any required environmental, cultural surveys, and in obtaining any required local, county, state, or national permits and approvals. Provide bid phase assistance including answering bidder questions and preparing and issuing addenda. Conduct bid evaluation and make recommendations to the City on acceptance of the lowest responsive responsible bidder. Work includes replacement of approximately 5,200 linear feet of existing 15-inch sewer with new 18-inch sewer west on Camelback Road from 29th Avenue to 31st Avenue (MH 19-22-120 to MH 19-22-116); South on 31st Avenue from Camelback Road to the north boundary of Bourgade Catholic High School (MH 11-22-116 to MH 18-21-403); and West along the north boundary of the high school and Cielito Park from 31st Avenue to 35th Avenue (MH 18-21-403 to MH 18-21-104). Work also includes replacement of approximately 800 linear feet of existing 18-inch sewer with new 21-inch sewer in 35th Avenue between the north boundary of Cielito park to Hazelwood Street (MH18-21-104to MH18-21-102). The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$3,500,000.00

Public - City

Site Work

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
43
Bidding Soon
1,018
All Active Projects
447
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.