BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Nevada, Iowa. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of February 19, 2021, a general contractor has been awarded. Work is scheduled to commence May 2021. The Work to be performed under these Contract Documents consists of the construction of the Nevada Wastewater Treatment Facilities (WWTF) - Phase 2. The Contractor will furnish and install all labor, materials, and equipment for the construction improvements project. The proposed wastewater treatment facilities include: Administration/Vehicle Storage Building with administrative area, control room, offices, IT room, training and breakroom, locker rooms, mezzanine, vehicle storage bays, electrical room, and emergency standby engine generator; Headworks Building with screening, grit removal, flow measurement; Three-Stage Oxidation ditch activated sludge system with flow splitter; Secondary Treatment Building with return sludge and waste sludge pumping and control, flow measurement, office and operations laboratory; Secondary Clarifiers with flow splitter, scum removal; Secondary Treatment Chemical Feed and Storage Building with storage tanks and chemical feed equipment; Ultraviolet Disinfection Building with UV disinfection equipment, flow measurement, effluent pumping, effluent sampling; Aerobic Digesters with integral membrane thickening units, diffused aeration and mixing system, and cover system; Solids Processing Building with waste sludge screening, permeate pumping, aeration blowers, biosolids pumping; Biosolids Storage Tank and Biosolids Pumping Station with tank decant, mixing system and truck load-out; Return Pumping Station; Sitework with access roads, yard piping, grading, drainage, yard structures, surfaces, erosion control, landscaping, fencing, lighting, security with associated mechanical, electrical, instrumentation and controls, architectural, and structural systems. CERTIFIED CHECK OR BID BOND: Five (5) percent of Total Amount of Bid PERFORMANCE, PAYMENT, AND MAINTENANCE BOND: 100% of the Total Contract Price PAYMENT: 95% of work completed on Monthly Estimates.

Award

Water / Sewer

$35,850,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
35
Bidding Soon
585
All Active Projects
232
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2021

May 17, 2021

img_map_placeholder

To Be Determined, Nevada, IA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.