BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Santa Barbara, California. Completed plans call for site work for a road / highway; and water / sewer project.

**As of 3/31/2021, project has not yet been awarded, no estimated time frame as of the moment.** Scope of Services Cul-de-sac at Rialto Lane due west to St James Drive: Repair and lining of 420 linear feet of a 15-inch diameter CMP storm drain. Between 865 and 869 La Milpita Road and running 150 linear feet southwest to its outlet: Lining of a12-inch diameter CMP storm drain. W. Carrillo Street starting at State Street and continuing to Canon Perdido Street: Lining of a 420 foot segment of the 24-inch diameter concrete storm drain. Pedregosa Street at Chapala Street south 1,900 linear feet to the outlet into Mission Creek south of the Islay and Castillo Streets Intersection: video capture of the large diameter storm drain system with elevations. Q&A Deadline 01/29/2021 12:00 PM (PST) Alternative Option: Approximately 420 feet of 15 inch Corrugated metal pipe has failed and will need to be replaced with 15" CIPP material 18" CHDPE. o The site inlet is located at 1360 Rialto Ln., with an identified inlet CB-C09-01. Installation of 15" CIPP at the inlet will extend downstream approximately 185' (TBD), to a Pre-Cast manhole to be installed and at a depth to be determined - maximum 5 feet below grade. o From the Pre-cast manhole, approximately 235 feet of 18" CHDPE will be installed to terminate at the existing MH-C09-01. Concrete anchors to be used at angle points (3). o Vegetation will need to be removed and replaced. o Two existing wood fences will need to be removed and replaced as well as a section of a patio concrete pad. o An existing 10 feet wide City Easement is in place. 1 o Right of Entry(s) will be secured by the City prior to construction. f o Use of heavy equipment may be limited due to site condition and steep grade. o Staging On-site is approved. Locations- 1360 Rialto Lane Storm Drain Repair 865 La Milpita Road Storm Repair 360 Video of the Pedregosa Storm Drain Project Cul-de-sac at Rialto Lane due west to St James Drive: Repair and lining of 420 linear feet of a 15-inch diameter CMP storm drain 2. Between 865 and 869 La Milpita Road and running 150 linear feet southwest to its outlet: Lining of a12-inch diameter CMP storm drain 3. W. Carrillo Street starting at State Street and continuing to Canon Perdido Street: Lining of a 420 foot segment of the 24-inch diameter concrete storm drain 4. Pedregosa Street at Chapala Street south 1,900 linear feet to the outlet into Mission Creek south of the Islay and Castillo Streets Intersection: video capture of the large diameter storm drain system with elevations The contract term is for 30 WORKING days.

Award

Water / Sewer

$215,000.00

Public - City

Site Work

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
72
Bidding Soon
1,241
All Active Projects
569
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 9, 2021

March 15, 2021

April 14, 2021

img_map_placeholder

Multiple Locations, Santa Barbara, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.