BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Whittier, California. Completed plans call for site work for a water / sewer project.

The Murphy Reservoir Replacement project consist of construction of a 2.31 Million Gallon (MG) prestressed concrete reservoir including exterior stairway, interior ladder, access hatches, vent, overflow pipe, drain line inlet, outlet line, sample taps, and miscellaneous appurtenances; demolition and removal of the existing two 0.5 MG concrete reservoirs; grading of the site; shotcrete wall; concrete masonry block retaining wall; installation and removal of two HDPE 10,000 gallon temporary water storage tanks (City Purchased); temporary 12" HDPE piping and fittings; approximately 750' of 16" DIP inlet/outlet line; approximately 126' of 12" inlet line; approximately 75' of 12" drain/overflow line; approximately 165' of 8" drain/overflow line approximately 1,175' of concrete curb and gutter and concrete swale; approximately 20,750 SF of AC Pavement, approximately 23,100 SF of aggregate base; connections to existing line, miscellaneous appurtenances including valve vault, check valves, flex tend flexible joint; underground conduits for power and SCADA; connection of the new electrical and SCADA to the Murphy Pump Station; level controls for the reservoir; miscellaneous lights and controls; and miscellaneous site work. All work shall be completed in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2018 Edition. All material that comes into contact with potable water shall be NSF 61 compliant.

Award

Water / Sewer

$6,495,000.00

Public - City

Site Work

50

21

19

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
486
Active Projects
233
Bidding Soon
3,719
All Active Projects
1,686
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 28, 2022

July 28, 2022

November 2, 2023

img_map_placeholder

To Be Determined, Whittier, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.