Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2021 at 8:00 PM

Updated May 31, 2024

Site work for a road / highway in Edmonton, Alberta. Completed plans call for site work for a road / highway.

Cold Milling, Asphalt Concrete Pavement and Other Work Central Region APPROXIMATE QUANTITIES: 71 875 tonnes Supply of Aggregate - With Option 500 cubic metres Subgrade Excavation 800 tonnes Granular fill 800 square metres Top Soil 126 800 square metres Cold Milling Asphalt Pavement - 70mm depth 19 200 square metres Cold Milling Asphalt Pavement - 70 200 tonnes ACP - EPS Mix Type 3 304 metres Remove of Existing Guardrail 3 235 metres HTCB Contractor to supply all materials.

Award

Roads / Highways

$5,758,316.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

97 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
41
Bidding Soon
553
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2021

February 1, 2021

Project location map

Multiple Locations, Edmonton, AB

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed