Published February 3, 2021 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a municipal facility in Chambersburg, Pennsylvania. Completed plans call for the renovation of a 6,374-square-foot municipal facility; and for site work for a municipal facility.

The work includes all material, labor, and equipment necessary for the renovation of 6,374 SF of office space adjacent to bulk archival storage along with all of the associated site work. This bid consists of four prime contracts consisting of General Construction, HVAC, Plumbing, and Electrical. Bid Security in an amount of ten percent (10%) of the Bidder's maximum bid is required to accompany the Bid. A performance and payment bond, each in the amount of one-hundred percent (100%) of the Contract Price shall be required from the Successful Bidder. The Contract is subject to the Prevailing Minimum Wage Determination established by the Commonwealth of Pennsylvania, Department of Labor and Industry. Bids shall be submitted only on the provided Bid Form included in the Bidding Documents. While Bidders may make comments to clarify their bid, Bidders cannot change, modify, delete, alter, amend, or make additions to the wording to any of the Bidding Documents, including but not limited to the Contract. Unauthorized conditions, exceptions, limitations, or provisions attached to a Bid may be cause for rejection of the Bid. Any questions regarding the Bidding Documents shall be submitted as Requests for Interpretation to Mark Weaver at mweaver@noelkerhull.com. The Bidding Documents may only be modified by Addendum issued prior to the Bid opening date. The County of Franklin Commissioners reserve the right to reject any or all proposals and to waive any or all defects, errors, omissions, irregularities, or informalities in a Bid or the Bid Procedure and to accept any Bid it deems to be in the best interests of the County of Franklin. County of Franklin is an Equal Opportunity employer. Delivery under this Project and Contract shall be fully and finally completed no later than October 8, 2021, except as may be mutually extended by Owner and Contractor. The work of this project is defined by the Contract Documents. The summary of work can be found within Section 011000 of the Franklin County Judicial Center Archives Building Renovations Phase 2 Project Manual, titled Summary. 2.2 The work of this contract shall be completed by four Prime Contractors. See Section 011200 of the Franklin County Judicial Center- Archives Building Renovations Phase 2 Project Manual titled Multiple Contract Summary for the responsibilities of each Prime Contractor in greater detail. Contractor shall pay for and provide all materials, labor, furniture, furnishings and equipment, tools, installation equipment, transportation and other services necessary for the proper completion of the work. 2.4 Contractor shall comply with all rules, regulations, laws, etc. of any public or private authority bearing on the performance of his work. Question & answers period to 01/11/21 Bid Results General Contractor ECI Construction -: $1,156,000 Mechanical Subcontractor Frey Lutz Corp -: $355,000 Plumbing Subcontractor Stouffer Mechanical Contractor :- $128,900 Electrical Subcontractor Frank B Lesher Electric -: $151,048

Award

Municipal

$1,790,948.00

Public - County

Renovation, Site Work

65

22

8

6

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork, Architectural Wood Casework, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Preparation for Re-Roofing, Dampproofing and Waterproofing, Thermal Protection, Fire and Smoke Protection, Firestopping, Joint Protection
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Metal Lath, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Storage Assemblies, Storage Racks, Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, Air Outlets and Inlets, Diffusers, Registers, and Grilles, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Screening Devices, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts, Material Storage, Storage Equipment and Systems, Storage Racks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
75
Bidding Soon
1,702
All Active Projects
752
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2021

February 22, 2021

img_map_placeholder

218 N 2nd St, Chambersburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Judicial Center- Archives Building Renovations Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.