BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fort Wayne, Indiana. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Project Development Services Four Intersection Improvement Projects (Allen, Elkhart and Wabash Counties), One ADA Sidewalk Ramp Construction Project (Various Locations) and One Traffic Signals Modernization Project (Various Locations) Owner Office Fort Wayne Dist / Capital Program Mgmt Contract Type Project Specific Compensation Method Lump Sum Two Step Scoring No Allowable Profit Rate 8.8% Plus Overhead Factor Is Federal Funding Involved Yes # of Firms to Select 1 The selected firm shall perform preliminary engineering and plan development services necessary to produce construction contract documents for the listed projects in accordance with INDOT's designated letting schedule. The selected firm shall complete an Engineering Assessment/Alternative Analysis for projects where one is not included in the RFP. The selected firm will also be responsible for: Environmental Document, Topographic Survey, Design & Plan Development, Permits Applications, Right-of-Way Plan Development (including R/W Engineering, Title Research and Staking), Geotechnical Engineering, Utility and Railroad Coordination, Pavement Design, Traffic Signal Design, Construction Phase Services, and other related services as needed. INDOT will perform the Real Estate Acquisition Services (including R/W Management, Appraising, Review Appraising, and Buying). In their LOI, interested firms shall highlight (3) Intersection Improvement projects (Des 1900142, 2000024 and 2000025). Other services such as Ecological Surveys, Archaeological Investigations, Historical/Architectural Investigation, Hydraulic Analysis, and Wetland Mitigation, may be included later if these work types become necessary. The selected firms fee proposal shall be due 45 calendar days after the selection date for this RFP item. These contracts will utilize the INDOT eInvoice application. 2000025 - US 24 Intersection Improvement, Median U-Turn, US 24 @ Wabash St, 1.15 Miles E of SR 15., in Wabash Co. RP 094+092 to RP 095+042 - $1,493,362.00 1900142 - SR 37 Intersect. Improv. W/ Added Turn Lanes, SR 37 @ Cuba/Thimler Road, 5.00 miles E of I-469; SR 37 @ Notestine Rd, 4.68 miles E of I-469., in Allen Co. RP 224+071 to RP 225+044 - $2,881,000.00 2001520 - VA VARI ADA Sidewalk Ramp Construction, At various locations in within the Bluffton & Wabash Subs., in Various Co. RP 000+000 to RP 000+000 The project's intent is to install or improved pedestrian accessibility throughout various communities in the Fort Wayne District. This work includes designing new ADA curb ramps &/or providing retrofit modifications to meet current ADA standards. Right-of-Way may need to be acquired during this project at specific locations. The selected communities/locations will be determined during beginning stages of project development. - $445,256.00 1800045 - SR 119 Intersection Improvement, 1.35 miles East of SR 19 (CR 7)., in Elkhart Co. RP 019+055 to RP 019+015 - $2,375,803.00 2000024 - SR 15 Intersect. Improv. W/ Added Turn Lanes, 3.06 miles North of US 6: (SR 15 at CR 146). , in Elkhart Co. RP 074+071 to RP 075+041 - $1,199,839.00 2001733 - VA VARI Traffic Signals Modernization, Various Signal Locations Within the Fort Wayne District., in Various Co. RP 000+000 to RP 000+000 The project's intent is to improve traffic signal performance and pedestrian accessibility throughout various intersections within communities in the Fort Wayne District. This work includes signal modifications (e.g. cantilever design/relocations, foundation design, installation of APS, signal head adjustments, etc.) and ADA curb ramp modifications. Right-of-Way may need to be acquired during this project at specific locations. The selected communities/locations will be determined during beginning stages of project development. - $1,858,988.00 Prequalification Required: Yes INDOT - RFP - Project Development Services As of January 6, 2022, the issuance of short-listed firms has not been released. The design firm selection has not been disclosed. Construction is slated to begin Fall of 2025 and completed Spring or Summer 2026. The firm construction timelines has not been released.

Conceptual

Roads / Highways

$10,254,248.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
57
Bidding Soon
559
All Active Projects
291
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2025

img_map_placeholder

Multiple Locations, Fort Wayne, IN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.