BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Mobile, Alabama. Completed plans call for site work for a water / sewer project.

As of January 6,2021 award recommendation will go to Gillis Construction, Inc. and bid amount of $37,000.00. The work performed under this contract shall not commence until the Contractor has submitted a Performance Bond, Labor & Material Bond, and Certificate of Insurance in an acceptable form. Performance Bond and Labor & Material Bonds shall be in an amount equal to 100% of the contract price; Certificate of Insurance shall be as per the attached requirements and countersigned by a licensed resident agent in the State of Alabama. This Requisition solicits proposals for construction services to furnish and install a height extension to the existing structural steel weir box as specified in the contract documents. The work area is located within the ASPA Pinto Terminal Dredge Material Management Area (DMMA) in Mobile, AL. The work performed will predominantly consist of the fabrication and installation of a 4' height extension to the existing structural steel weir box, fabrication and installation of a ladder to facilitate accessibility to the top of the newly raised weir box from the existing levee, disposal of all removed materials associated with the work and cleanup of the site after all work is complete. All work shall be in accordance with the requirements stated herein, Scope of Work Specifications, Insurance Requirements and applicable State of Alabama and Federal Laws.The work consists principally of providing bonds, labor, materials, equipment, insurance and supervision necessary for the fabrication, installation and accessibility of the weir box height extension as specified in the contract documents. The work also includes the performance of any necessary modifications to the existing weir box to facilitate the installation of the new extension. All materials, labor, tools, rigging and equipment necessary to perform the work shall be included by the Contractor in the proposal. It is the Contractor's responsibility to field verify all dimensions and site conditions essential for the successful completion of the work. The Contractor is responsible for the disposal of all waste materials associated with the work.

Award

Water / Sewer

$37,000.00

Public - State/Provincial

Site Work

5

1

2

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
22
Bidding Soon
467
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2020

January 18, 2021

img_map_placeholder

To Be Determined, Mobile, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.