BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Florence, Arizona. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of December 27, 2022, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: ADOT is accepting Statement of Qualifications (SOQs) from Consultants to provide 2021-007; Roadway Widening. AND. 2021-008; Roadway Widening. All format requirements, submittal guidelines, instructions and documentation submission contained in this RFQ Package are for the ECS Contract Number and ADOT Project Number referenced above. SOQ submittals failing to follow the format, online submittal guidelines or any other instructions outlined in this RFQ Package shall be rejected. ECS reserves the right to reject any and all SOQs, cancel the advertisement, negotiations or contract at any time in the best interest of the State. These contracts have been established as Race Neutral with a 0.0% DBE Goal. The Compensation Type for these contracts will be Lump Sum. The non-negotiable Fixed Fee for this contract, and any applicable extensions, has been established at 9%. Questions, in writing, shall be received by the ECS until December 17, 2020 at 2:00 P.M. (Arizona Time). No further questions shall be accepted after the time specified. All Consultants will be notified of any Consultants request for information and ECS response(s) to the question(s). RFQ Amendments, deadline changes or any other contract information shall be posted on the ECS website as an Amendment to the RFQ. Any Amendments issued as part of this RFQ package shall be signed and included by the Consultant in the SOQ submittal. Failure to do so shall result in rejection of the SOQ. See Section IV and V for further instructions. Any violation of the contact restrictions may be grounds for rejection of the Prime Consultants SOQ Final Questions Due: December 17, 2020 at 2:00 P.M. (Arizona Time) Estimated Selection Date: February 02, 2021 Initial Cost Proposal Due Date: February 17, 2021 Estimated Contract Notices to Proceed Date: May 03, 2021 The method of contractor selection has not been determined at this time. AZDOT - RFQ Engineering - Final Design, Interstate 10, Dirk Lay Road to South of State Route 387 Roadway Widening

Conceptual

Roads / Highways

$1,900,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
17
Bidding Soon
753
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.