BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Coppell, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of October 8, 2021, this project has not yet been awarded. A timeline for award has not yet been established. The work shall consist of the construction of a new 6.15 MGD Sandy Lake Lift Station (SLLS) inclusive of yard piping, electrical improvements, site improvements, decommissioning of the existing lift station, permanent flow meter installation at six sites in City of Coppell including the SLLS, SCADA improvements at facilities through City of Coppell, and all appurtenant work necessary to complete construction of the project. Project Locations: 1. Sandy Lake Lift Station: 1003 E Sandy Lake Rd, Coppell, Texas 2. Deforest Lift Station: 680 Deforest Rd, Coppell, Texas 3. Southwestern Elevated Tank: 520 Southwestern Blvd, Coppell, Texas 4. Wagon Wheel Elevated Tank: 1001 Northpoint Dr, Coppell, Texas 5. Village Parkway Pump Station: 1078 Village Parkway, Coppell, Texas 6. Service Center: 816 S Coppell Rd, Coppell, Texas 7. Flow Meter at Andrew Brown Park, Coppell, Texas 8. Flow Meter near Mockingbird Lane and Beltline Road, Coppell, Texas 9. McInnish Park - TRA Meter MS17_0E: Southwest corner of McInnish Park, Carrollton, Texas 10. Cypress Waters - TRA Meter MS17_5E: Approximately 0.26 miles east of Belt Line Road and Mockingbird Lane intersection, Coppell, Texas Q & A deadline: Sep 23, 2021 3:00:00 PM EDT A. The Work, under this Contract, consist of construction of a new 6.15 MGD Sandy Lake Lift Station (SLLS) inclusive of yard piping, electrical, grading and concrete pavement, site improvements, decommissioning of the existing lift station, permanent flow meter installation at six sites including the SLLS, and instrumentation and control improvements and all project locations. Work will included replacement of PLCs, Radios, HMI Software, Computers/Servers. B. The Project consists of the Work in the Plans and Specifications. C. The construction Work to be executed in the field will be based on Final Construction. Drawings and Specifications, which will be prepared by the Engineer based on the Work included in the Conformed Plans and Specifications. D. Unless otherwise specified, Contractor shall provide the following: 1. Temporary facilities and controls as specified in SECTION 01 32 39 CONTRACTOR REQUIREMENTS. 2. Provide quality control, material testing, field-testing, and related services in accordance with requirement of each Specification Section. 3. Provide quality assurance and control services in accordance with requirements in each Specification Section. Owner provided quality assurance and quality control services would be an overview of the Work during construction. 4. Provide training of Owner's operation and maintenance personnel in accordance with SECTION 01 78 23 OPERATIONS AND MAINTENANCE DATA. 5. Field surveying required for support of construction operations. Applicable permits, licenses and jurisdictional inspections, certificate of occupancy, and related work as necessary for Owner to assume operation of facility.

Award

Water / Sewer

$6,466,574.00

Public - City

Renovation, Site Work

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
64
Bidding Soon
3,475
All Active Projects
1,331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2021

November 29, 2021

img_map_placeholder

E Sandy Lake Rd, Coppell, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.