BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 22, 2021 at 8:00 PM

Updated August 13, 2024

Site work and paving for a mixed-use development in Honey Creek, Iowa. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

If you have any questions or would like to schedule a site visit, please contact Jeff Franco at Hitchcock Nature Center, 27792 Ski Hill Loop, Honey Creek, Iowa 51542, Phone (712) 328-5831 or jeff.franco@pottcounty-ia.gov. Questions will be addressed up to 24 hours before the bid opening. All Work shall be performed by contractors licensed with the County where the work is to take place. Bidders shall determine licensing requirements prior to bidding. The Work includes: Package A: Park Entry Road Improvements, Package B: Lodge Front Entrance, Package C: Parking Improvements, and the Design Addendum applicable to portions of Package A and Package C. Package A: Remove part of existing road into park and realign new asphalt roadway with 2 new entry lanes separated by concrete medians with site grading and new culvert pipe at entrance. Coordinate with owner on and install payment kiosks and associated conduit. Package B: Alter Loess Hills Lodge front entrance walkway by reducing width and relocating ADA parking stalls. Package C: Provide grading for and construct parking areas at three locations. Provide new concrete pad for ADA parking at existing shelter location. Add sidewalk and associated grading as provided in Addendum. A 5% id bond is required. No bidder may withdraw their proposal within 15 days after the bid opening. A 100% Performance Bond and Payment Bond will be required. Pottawattamie County Conservation is sales tax exempt. Exemption certificates will be issued to the contractor, sub-contractors and suppliers on this project. The bidders shall not include sales tax in their bids. Pottawattamie Conservation would like project construction to begin in late June or early July 2021. A start date and NTE completion date will be negotiated by the selected contractor and the County. Should the Contractor fail to meet the agreed upon NTE completion date, the Contractor agrees to pay the Owner as liquidated damages and not as a penalty, the sum of $250.00 for each and every calendar day that the Contractor is in default of substantial completion of the work under this Contract.

Bid Results

Playgrounds / Parks / Athletic Fields

$711,644.00

Public - County

Paving, Site Work

43

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
96
Bidding Soon
982
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2021

February 26, 2021

Project location map

27792 Ski Hill Loop, Honey Creek, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.