Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a service station / car wash facility in Sleepy Eye, Minnesota. Completed plans call for the construction of a service station / car wash facility; for site work for a service station / car wash facility; and for paving for a service station / car wash facility.
The following summary is a general guide to the scope of work. 1. Site grading 2. Construction of new Truck Station Building No. 91610 3. Construction of new Unheated Storage Building No. 91612 4. Construction of new Salt Storage Shelter No. 21635 5. Construction of new Covered Storage Bins No. 91618 6. Construction of new Uncovered Storage Bins 7. Installation of new site utilities 8. Bituminous paving 9. Installation of site fencing 10. Turf establishment This project has a 5 % Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goals Time of Completion Requirements 1. Substantial Completion of Salt Storage Shelter No. 21635 shall be achieved on or before 1 October 2021. 2. Substantial Completion of the remaining Phase 1 work as outlined in Specification Section 01 1001 Phasing Requirements shall be achieved on or before 1 March, 2022. a. Upon Certification of Substantial Completion of Phase 1 work, the Contractor shall achieve Final Completion of the Substantial Completion Punchlist items within a maximum of 30 calendar days. b. Milestone 1) Phase 1 Sitework: Provide removals, excavation, backfill and compaction as outlined in Division 31-32 and civil plan sheets not later than 1 September 2021. 2) Phase 1 Utilities: Provide installation of electric utility, water utility and sewer utility not later than 15 September 2021. 3) Phase 1 Paving: Provide bituminous paving not later than 1 October 2021. 2. Substantial Completion of the Phase 2 work as outlined in Specification Section 01 1001 Phasing Requirements shall be achieved on or before 1 July, 2022. a. Upon Certification of Substantial Completion of Phase 2 work, the Contractor shall achieve Final Completion of the Substantial Completion Punchlist items within a maximum of 30 calendar days. A maximum of an additional 45 calendar days will be allowed for contract closeout. Prime Contractor Responses must be submitted and received in the Quest CDN Plan Room no later than 3:00 pm on January 12, 2021. Sub Contractor Responses must be submitted and received in the Quest CDN Plan Room no later than 1:30 pm on December 29, 2020 The contractors compliance with MN Statutes, Section 363A.36 and part 5000.3520 shall be based on its implementation of the equal opportunity clause, specific affirmative action obligations required by the specifications in part 5000.3540, and its efforts to meet the goals established for the geographical area where the contract resulting from this solicitation is to be performed. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from contractor to contractor or from project to project for the sole purpose of meeting the contractors goals shall be a violation of the contract, MN Statutes, Section 363A.363 and part 5000.3520. Compliance with the goals will be measured against the total work hours performed.
Under Construction
Service Station / Car Wash
$214,300.00
Public - State/Provincial
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 29, 2020
March 1, 2021
900 Cedar St NE, Sleepy Eye, MN
Related To This Project
Sleepy Eye, MN
Bid Date: Sep 25 2020
Sleepy Eye, MN
Bid Date: Oct 02 2023
Sleepy Eye, MN
Bid Date: Oct 18 2023
Sleepy Eye, MN
Bid Date: Mar 06 2024
Sleepy Eye, MN
Bid Date: Apr 03 2024
Sleepy Eye, MN
--
Bridge Replacement and Approach Grading on Brown County CSAH 8 and Renville County CSAH 3. - 4725017
Sleepy Eye, MN
Bid Date: Jun 15 2022
Sleepy Eye, MN
Bid Date: Jan 12 2021
Sleepy Eye, MN
Bid Date: Nov 20 2020
Sleepy Eye, MN
Bid Date: Oct 17 2022
New Hope, MN
Bid Date: Feb 28 2023
Caledonia, MN
Bid Date: Feb 22 2023
Plymouth, MN
Bid Date: Feb 27 2023
Mahnomen, MN
Bid Date: Mar 03 2023
Plymouth, MN
Bid Date: Feb 27 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.