Site work, paving and new construction of a service station / car wash facility in Sleepy Eye, Minnesota. Completed plans call for the construction of a service station / car wash facility; for site work for a service station / car wash facility; and for paving for a service station / car wash facility.

The following summary is a general guide to the scope of work. 1. Site grading 2. Construction of new Truck Station Building No. 91610 3. Construction of new Unheated Storage Building No. 91612 4. Construction of new Salt Storage Shelter No. 21635 5. Construction of new Covered Storage Bins No. 91618 6. Construction of new Uncovered Storage Bins 7. Installation of new site utilities 8. Bituminous paving 9. Installation of site fencing 10. Turf establishment This project has a 5 % Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goals Time of Completion Requirements 1. Substantial Completion of Salt Storage Shelter No. 21635 shall be achieved on or before 1 October 2021. 2. Substantial Completion of the remaining Phase 1 work as outlined in Specification Section 01 1001 Phasing Requirements shall be achieved on or before 1 March, 2022. a. Upon Certification of Substantial Completion of Phase 1 work, the Contractor shall achieve Final Completion of the Substantial Completion Punchlist items within a maximum of 30 calendar days. b. Milestone 1) Phase 1 Sitework: Provide removals, excavation, backfill and compaction as outlined in Division 31-32 and civil plan sheets not later than 1 September 2021. 2) Phase 1 Utilities: Provide installation of electric utility, water utility and sewer utility not later than 15 September 2021. 3) Phase 1 Paving: Provide bituminous paving not later than 1 October 2021. 2. Substantial Completion of the Phase 2 work as outlined in Specification Section 01 1001 Phasing Requirements shall be achieved on or before 1 July, 2022. a. Upon Certification of Substantial Completion of Phase 2 work, the Contractor shall achieve Final Completion of the Substantial Completion Punchlist items within a maximum of 30 calendar days. A maximum of an additional 45 calendar days will be allowed for contract closeout. Prime Contractor Responses must be submitted and received in the Quest CDN Plan Room no later than 3:00 pm on January 12, 2021. Sub Contractor Responses must be submitted and received in the Quest CDN Plan Room no later than 1:30 pm on December 29, 2020 The contractors compliance with MN Statutes, Section 363A.36 and part 5000.3520 shall be based on its implementation of the equal opportunity clause, specific affirmative action obligations required by the specifications in part 5000.3540, and its efforts to meet the goals established for the geographical area where the contract resulting from this solicitation is to be performed. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from contractor to contractor or from project to project for the sole purpose of meeting the contractors goals shall be a violation of the contract, MN Statutes, Section 363A.363 and part 5000.3520. Compliance with the goals will be measured against the total work hours performed.

Under Construction

Service Station / Car Wash

$214,300.00

Public - State/Provincial

New Construction, Paving, Site Work

72

30

7

10

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
31
Bidding Soon
441
All Active Projects
202
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 29, 2020

March 1, 2021

img_map_placeholder

900 Cedar St NE, Sleepy Eye, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.