Site work and paving for a road / highway in Sacramento, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

BASE BID 1: EXTERIOR AREA-1--- GRIND AND CAP 1. The OC Fair will remove and reinstall 14 concrete car stops 2. The contractor will need to grind 7,142 square feet at 2 inches down and haul all grinding off site 3. Install 7,142 square feet at 2 inches thick of 1/2 to fine asphalt hot rock 4. Contractor will restripe the 20 ADA stall, 12 ADA cross hatches in blue paint and one stop with line in white AREA-2 --CONCRETE, CAP, OVERLAY 1. Saw cut 342 linear feet of asphalt 2. Remove 5 feet wide x 178 feet long at 6 inches thick of asphalt 3. Remove 2 inches of base for a total of 8 inches down 4. Remove 6 feet x 6 feet at 8 inches thick concrete corner of a v-ditch and haul off site 5. Compact sub base to 95% or greater 6. Form 4 feet wide x 178 feet long and 8 inches thick 7. The corner of the concrete v-ditch 5 feet x 5 feet that was removed will need a. 2 x 1/2 inch by 12 inches rebar dowels epoxied in on both sides b. (2) sticks of 1/2 rebar running the length of the 178 feet c. pour concrete at 3,500 psi v-ditch i. drain downhill and with no bird baths 8. Pull forms and install 6 inches wide x 8 inches depth 178 feet long on both side of fresh poured v-dich 9. Grind 18 inches x 427 feet long around area for over lay and cracked out area 10. Cap 18 inches x 210 feet of 1/2 inch to fine hot rock asphalt mix 11. Add tack to the fresh grinded corners and overlay 3023 square feet of 1/2 inch to fine asphalt AREA - 3 --R&R 1. There are two areas next to each other, 27 feet x 15 feet 17 feet x 28 feet 2. Saw cut both areas at 174 linear feet 3. Remove 2 1/2 inches of asphalt in both areas 4. Remove 2 1/2 inches of base in both areas 5. Remove 9 inches of sub base soil in both areas. 6. Compact subgrade in both area to 95% or greater 7. Install 2 lifts of road base at 4 inches per lift and compact with water in both areas 95% 8. Install asphalt in both areas with first lift at 3 inches with 3/4 inch hot rock asphalt, second lift at 3 inches with 1/2 to fine hot rock asphalt AREA - 4 --grind & cap 1. At the tip of the concrete v-ditch it will need to be grid down 2 inches (2 feet x 5 feet) and caped with 1/2 to fine hot rock asphalt AREA - 5 ---R&R 1. There is one area 22 feet x 15 feet 2. Saw cut 74 linear feet 3. Remove 2 1/2 inches of asphalt 4. Remove 2 1/2 inches of base 5. Remove 9 inches of sub base soil 6. Compact subgrade to 95% or better 7. Install 2 lifts of road base at 4 inches per lift and compact with water 8. Install asphalt with first lift at 3 inches with 3/4 inch hot rock asphalt, second lift at 3 inches with 1/2 to fine hot rock asphalt AREA- 6---R&R 1. There is one area 19 feet x 59 feet. 2. Saw cut 156 lines feet. 3. Remove 4 inches of asphalt. 4. Remove 4 inches of base. 5. Remove 6 inches of sub base soil. 6. Compact subgrade to 95% or better. 7. Install 2 lifts of road base at 4 inches per lift and compact with water. 8. Install asphalt with first lift at 3 inches with 3/4 inch hot rock asphalt, second lift at 3 inches with 1/2 to fine hot rock asphalt. Project Start- January 8, 2021 Completion and Close-Out - January 20, 2021

Bid Results

Roads / Highways

$206,995.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
81
Bidding Soon
1,514
All Active Projects
627
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2020

January 8, 2021

img_map_placeholder

Multiple Locations, Sacramento, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.