Site work and renovation of a civil project in Bastrop, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

*As of July 13, 2022, a construction management team has been awarded. The project includes construction of three (3) new water wells in the Simsboro Aquifer, and completion of an existing well; approximately 14,000 lf of 10" to 24" well field gathering pipeline to convey raw water to the water treatment plant; a new 6 million gallons per day (MGD) water treatment plant with chemical feed systems and conventional filtration for removal of iron and manganese; office/laboratory building; chemical storage/feed building; concrete ground storage tank; transfer pump station and approximately 21,500 lf of 24" transmission pipeline; wastewater lift station and approximately 21,500 lf of 8" force main; standby electrical generator and other ancillary facilities. The City of Bastrop, Texas is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction services and complete construction services for the Simsboro Aquifer Water Treatment Plant, Well Field and Transmission Facilities Project. The selected CMAR will work as a team with the City staff and its Design Professional to ensure an efficient design approach and construction delivery of the project. Questions regarding this RFP or the project may be submitted in writing via email to the City's Project Manager, Tony Buonodono, PE at tbuonodono@cityofbast The CMAR will begin with the firm in an agency support role for preconstruction services. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods and will be required to solicit bids from prequalified subcontractors to perform the work using the City's subcontractor selection process. The GMP must be submitted in CSI format or it will not be accepted. RFP Conference to Answer Questions December, 2020 Selection Committee Proposal Evaluation Jan 15 - Feb 4, 2021 * CMAR Interviews (if necessary) February 1 - 2, 2021 * CMAR Design Phase Contract Negotiation February 5 - 22, 2021 * Council approves Selected CMAR Firm March 9, 2021 * CMAR Notice to Proceed March 10, 2021

Award

Water / Sewer

$35,000,000.00

Public - City

Renovation, Site Work

1

4

17

7

Subscribe For Documents

116 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
44
Bidding Soon
2,327
All Active Projects
891
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2021

September 26, 2022

img_map_placeholder

To Be Determined, Bastrop, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.