Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 30, 2026 at 8:00 PM
Updated November 8, 2026
Renovation of a medical facility in Seattle, Washington. Working plans call for the renovation of a medical facility.
https://www.chronline.com/stories/harborview-expansion-costs-soar-70-to-3-billion,410876 Harborview expansion costs soar 70 to 3 billion Harborview Medical Center Harborview Medical Center Google Streetview Posted Wednesday October 28 2026 959 am David Gutman The Seattle Times TNS The costs to renovate and expand Harborview Medical Center Washingtons only highestlevel trauma center have increased by more than 70 since voters approved the project in 2020 to an estimated 3 billion The project includes a new 14story medical tower that will add hundreds of patient beds a new parking garage with hundreds of spots and a new behavioral health primary care clinic The project also includes renovations and seismic retrofitting on Harborviews existing facilities In 2020 King County voters approved a 174 billion bond measure backed by a property tax increase to fund the countyowned hospitals renovation and expansion Progress on the project has been slow and halting initially disrupted by the pandemic and then by a scope that has at times both expanded and contracted Its also proved more complex than officials led by former Executive Dow Constantine predicted The tower with seven new floors of inpatient beds a new emergency department and surgical center and a skybridge connecting it to the existing hospital is now not expected to open to patients until 2032 a dozen years after voters approved the project The soaring costs have left elected officials searching for funding sources to fill the projected gaps The big sort of headline number is the 3 billion cost estimate Metropolitan King County Councilmember Jorge Barn said at a briefing Tuesday How do we plan to pay for that overage in order for us to continue moving forward Jeff Muhm a special adviser to County Executive Girmay Zahilay said they have been examining options to fill the funding gap This is an all hands on deck situation Muhm said We need to work with federal partners state partners and look at all options The state Legislature in 2024 gave counties the option of raising property taxes without a vote of the people to help fund the operation maintenance and expansion of countyowned hospitals Harborview is the only countyowned hospital in the state The County Council two years ago used that mechanism to raise money for Harborview that was then funneled into helping run the countys 13 public health clinics Secure Your Familys Future with 318 Cr Wealth Growth Axis Max Life by TaboolaSponsored Links The planned tower has grown from 10 to 14 stories to accommodate more mechanical and electrical space as well as ambulance staging said Anthony Wright an engineer and division director with the countys Department of Executive Services Parking has also been identified as a more pressing need than when the bond was passed in 2020 officials said While design of the project is underway and has been for years construction has not yet begun and likely wont begin until next year Construction on the new tower the centerpiece of the project is not slated to begin until early 2028 Before that can begin a whole suite of critical make ready projects need to be completed to ensure that Harborview can continue operating through construction Roads need to be built to haul materials in and out they need temporary power and water sources and ambulance turnarounds It requires a tremendous amount of coordination and phasing so that these occur without disrupting operations Wright said In the meantime theres no guarantee that costs wont continue to rise Wright said he expects the county to have an agreed upon guaranteed maximum price from their contractor in 2028 Costs he said have risen both because the scope of the project has changed and because of outside inflationary reasons The first factor Wright said the COVIDdriven construction inflation that saw costs soar for nearly all big projects that were planned immediately before the pandemic At the same time he said that costs for specific things like medical equipment steel and copper have risen fasterthan regular inflation Tricky soil conditions on First Hill found during geotechnical studies of the site have meant that the project will need a more expensive foundation More recently Wright said tariffs imposed by the Trump administration have made contractors increase their prices and made them reluctant to make longterm pricing commitments Increased fuel prices driven in part by the war in Iran have caused cost estimates for the project to rise And a surge in data center construction which is fueling the AI boom has driven demand for electricians and electrical infrastructure causing delays and spiking costs For instance Wright said they expect the new parking garage to be complete in late 2028 But that timeline is driven not by how fast it can be built but how fast electrical switches can be manufactured and delivered to the project ------------ As of June 22, 2026, this project is undergoing financing disputes. A general contractor has been identified. A firm construction timeline has yet to be established.
Pre-Construction/Negotiated
Medical
$248,000,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 27, 2027
325 9th Ave, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Jun 17 2022
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Nov 09 2020
Seattle, WA
Bid Date: Aug 02 2021
Seattle, WA
--
Seattle, WA
Bid Date: Apr 12 2021
Seattle, WA
Bid Date: Jun 15 2022
Seattle, WA
Bid Date: Jun 15 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed