Site work for a water / sewer project in San Jose, California. Completed plans call for site work for a water / sewer project.

***As of February 18, 2021 project has not been awarded yet. It is anticipated to be awarded on March 23,2021. Contract Time. Time limit for the completion of the Work is 433 calendar days. See Contract Documents, Special Provisions, Article 12.03. Contract Time(s) for Milestones and Contract Times. Liquidated Damages. See Standard Provisions, Liquidated Damages, Article 5.07 and Special Provisions, Liquidated Damages, Article 12.05 of the Contract Documents for requirements regarding Liquidated Damages. Estimated Cost. The estimated cost of the Project is $4.2 million. This estimate is intended to serve merely as an indication of the magnitude of the Work. Neither the Bidder(s) nor the Contractor will be entitled to pursue a claim or be compensated due to variance in the stated estimated cost range Contractor License Requirement. The Bidder must possess a current Class A Contractor license issued by the California Department of Consumer affairs, Contractor State License Board when the Bid is submitted. Regardless of whether a subcontractor must be identified at the time of Bid, each subcontractor must also be properly licensed to perform its scope of Work. The objective of the Pre-Bid conference/site visit is to familiarize prospective Bidders with the site; no additional site visits will be allowed. Please confirm your intent to attend the Pre-Bid conference/site visit 24 hours in advance by sending an email to scvwdplanroom@valleywater.org. Additional information regarding the Pre-Bid conference/site showing will be sent to all prospective Bidders who confirm their intention to attend. Every attendee will be required to show a government-issued photo ID (Driver License, Photo ID, or passport). In response to the COVID-19 pandemic, the District will require that all participants adhere to the orders of Social Distancing. All persons attending the Pre-Bid conference/site visit are required to adhere to the orders of Social Distancing and are also required to bring and wear the appropriate Personal Protection Equipment (PPE), i.e., protective face covering, in order to be allowed entrance onto the site and to remain on the site. Reasonable efforts will be made to accommodate persons with disabilities wishing to attend the Pre-Bid conference/site visit. Please request accommodations when confirming attendance Inquiries. The Bidder must submit all requests for clarification, or interpretation of the Bid Documents in accordance with the requirements stated in Instructions to Bidders, paragraph #7. Questions During Bidding. Written questions must be directed to the Contracts Administrator at scvwdplanroom@valleywater.org and submitted at least nine (9) calendar days before the deadline for receipt of Bids. Process Questions. For questions regarding the bid process, please contact the District Plan Room at scvwdplanroom@valleywater.org or call Kristy McMurtrie (408) 630-3088. (1) Demolish and remove all components of each existing basin including, but not limited to: (a) Rails and supporting brackets (b) Drive chain and flights (c) Floor wear strips (d) Sprockets and bearings (e) Drive Shafts (f) Drive Motors (g) Sludge Launder troughs and its supports (h) Sludge draw off valves and piping (2) Demolish and remove the existing paddle reels, shafts and bearings. (3) Demolish and remove the existing wood baffle wall panels. (4) Demolish and remove the existing tube settler modules. b. Remove existing basin concrete top-coating and surface repair and prepare mortar base-coating: (1) Provide National Association of Corrosion Engineers (NACE) Level III certified inspection oversight for all basin coating removal and surface preparation work. (2) Remove existing concrete epoxy top-coating from all three (3) flocculation and sedimentation basins without removing and/or disturbing concrete mortar base-coating. (3) Repair all anomalies and/or deteriorated areas of the remaining concrete mortar base-coating and prepare the mortar-based coating for exposed service.

Award

Water / Sewer

$5,033,125.00

Public - County

Site Work

Subscribe For Documents

97 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
74
Bidding Soon
1,548
All Active Projects
668
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2021

March 29, 2021

img_map_placeholder

3959 Whitman Way, San Jose, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.