Site work for a water / sewer project in Pooler, Georgia. Completed plans call for site work for a water / sewer project.

The work will include all equipment, materials, supplies, labor, and all other costs associated with the clearing, grading, and stabilization of an approximate 16.2 Acre flood plain mitigation area adjacent to the Pipe Makers Canal west of I-95 City of Pooler reserves the right to waive any informalities, to reject any and all bids, to evaluate bids, to accept portions of any bids and to accept any bid, which in its opinion, may be in the best interest of the City of Pooler and reserves the right to add to or delete from the contract after the contract has been awarded. Bidders must be able to demonstrate a minimum of 5 years of municipal work experience in drainage improvements and canal maintenance in addition to other requirements. Insurance certificates, meeting those limits as stated in the bid documents, 5% bid bond in the form of a bond submitted by a surety authorized to conduct business in the State of Georgia, or certified or cashier's check and a non-collusion affidavit must be completed and submitted with the bid. City of Pooler, Georgia

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

15

1

6

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Dies

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
18
Bidding Soon
469
All Active Projects
239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2021

February 22, 2021

img_map_placeholder

I-95, Pooler, GA

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Pipemakers Canal Improvements - Division 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.