BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a museum in Morrisville, Pennsylvania. Completed plans call for site work for a 8,059-square-foot museum.

Pennsbury Manor Phase 2 Path Restoration- Re-construction, stabilization and resetting of existing gravel and brick pathways and site restoration. ESTIMATED RANGE: .1 General - $100,000 - $200,000 Liquidated Damages = (.1) $100.00 per day. There is no Bid Guaranty required for this Project. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction - ALL BASE BIDS (#1, #2 & #3) SDB = N/A VBE = N/A All proposers must be registered to view/download Plans and Specifications and must have a Current, Active Vendor Number. To register click the following link: register All Proposers are required to create a user profile within e-Builder. Please click on discip line below to create a user profile and view the bid package: General Construction Duration: 90 Calendar Days from date of Initial Job Conference Rehabilitation of numerous buildings and site development throughout the site; including the following structures and sites: 1. Formal Garden (south of Manor House) 2. Staff Yard (north of Manor House) Bid Results - Base Bid - Ocean Construction - 57,400.00 Base Bid 2 - Ocean Construction - 20,900.00 Base Bid 3 - Ocean Construction - 22,600.00

Award

Museum

$166,000.00

Public - State/Provincial

Site Work

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
217
Bidding Soon
4,214
All Active Projects
1,961
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2021

February 23, 2021

img_map_placeholder

400 Pennsbury Memorial Rd, Morrisville, PA


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.