Published September 7, 2022 at 8:00 PM

Updated November 15, 2023

Renovation of a day care center in Guelph, Ontario. Completed plans call for the renovation of a day care center.

*Award amount was not released for publication. *Construction is complete. BAS Renewal: - Provide building control system, including field controllers, hardware, software, networks, components, devices, control valves, ventilation damper actuators, removal of pneumatics. - Mounting and services for Owner and Allowance furnished products, including building control system supervisory controllers. - Interface to building control system supervisory controllers. - Add 6 variable frequency drives. - Provide electrical services, including wiring for power, limited power, communication, control. - Replace 38 control valves and add 2 control valves at various equipment, including air handlers, terminal heaters, reheat coils, perimeter radiant panels. - Add 2 reheat coils and relocate 1 reheat coil, add 2 supply air diffusers, add 2 return air grilles. - Provide mechanical services, including modifying ductwork, piping. AHU Renewal: - Provide pre-construction air testing of all air handlers (supply and return fans), exhaust fans. - Replace 6 fan motors on supply fans and return fans. Replace/modify 6 fan pulleys as required to achieve airflow. - Add 6 manual balancing dampers for corridor supply. - Provide testing, measurements, balancing for entire air distribution systems, hydronic distribution systems. The work will be completed in phases/stages to minimize disruption to facility operations and building systems. First stage of BAS work will include the installation of the BAS supervisory controller(Panel provided by CBRE/ESI and installed by the Contractor), field controller(s), main network switch, network wiring, and remote access. The first phase will need to complete the BAS network to all areas before installing any field controllers or control devices. For the first phase, existing control system is not to be deactivated. The second phase/stage will include all remaining work for BAS Renewal project. Work within each zone must be fully complete before progressing to the next zone. Some portions of work under Phase 1 and 2 can take place concurrently.

Award

Day Care Centers

$100,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
446
Active Projects
197
Bidding Soon
4,684
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.