BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a day care center in Guelph, Ontario. Completed plans call for the renovation of a day care center.

*Award amount was not released for publication. *Construction is complete. BAS Renewal: - Provide building control system, including field controllers, hardware, software, networks, components, devices, control valves, ventilation damper actuators, removal of pneumatics. - Mounting and services for Owner and Allowance furnished products, including building control system supervisory controllers. - Interface to building control system supervisory controllers. - Add 6 variable frequency drives. - Provide electrical services, including wiring for power, limited power, communication, control. - Replace 38 control valves and add 2 control valves at various equipment, including air handlers, terminal heaters, reheat coils, perimeter radiant panels. - Add 2 reheat coils and relocate 1 reheat coil, add 2 supply air diffusers, add 2 return air grilles. - Provide mechanical services, including modifying ductwork, piping. AHU Renewal: - Provide pre-construction air testing of all air handlers (supply and return fans), exhaust fans. - Replace 6 fan motors on supply fans and return fans. Replace/modify 6 fan pulleys as required to achieve airflow. - Add 6 manual balancing dampers for corridor supply. - Provide testing, measurements, balancing for entire air distribution systems, hydronic distribution systems. The work will be completed in phases/stages to minimize disruption to facility operations and building systems. First stage of BAS work will include the installation of the BAS supervisory controller(Panel provided by CBRE/ESI and installed by the Contractor), field controller(s), main network switch, network wiring, and remote access. The first phase will need to complete the BAS network to all areas before installing any field controllers or control devices. For the first phase, existing control system is not to be deactivated. The second phase/stage will include all remaining work for BAS Renewal project. Work within each zone must be fully complete before progressing to the next zone. Some portions of work under Phase 1 and 2 can take place concurrently.

Award

Day Care Centers

$100,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
105
Bidding Soon
2,393
All Active Projects
954
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2021

February 25, 2021

img_map_placeholder

2 South Ring Road W, Guelph, ON

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.