BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 26, 2021 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Princeton, Texas. Completed plans call for site work for a water / sewer project.

The Work is to include furnishing all labor, materials, and equipment, and performing all work necessary for the drainage improvements requiring installation of Three-hundred and Seventy- Seven linear feet (377 LF) of 21 inch RCP storm line and four hundred and fifty-one linear feet (451 LF) of 24 inch RCP storm line for Park Trails Phase I Drainage Improvements in Princeton, Texas designed by Kimley-Horn and Associates, Inc. Furnish all labor, materials, equipment and incidentals necessary to perform all trenching for pipelines and appurtenances, including drainage, bedding, filling, backfilling, disposal of surplus material, and restoration of trench surfaces and easements. Excavation shall be extended to the width and depth shown on the Drawings or as specified and shall provide suitable room for installing pipe, structures and appurtenances. Furnish and place all sheeting, bracing and supports and remove from the excavation all materials which the Engineer may deem unsuitable for backfilling. The bottom of the excavation shall be firm, dry, and in all respects acceptable. If conditions warrant, the Contractor may be ordered to deposit gravel for pipe bedding, or gravel refill for excavation below grade, directly on the bottom of the trench immediately after excavation has reached the proper depth and before the bottom of the trench has become softened or disturbed by any cause whatever. The length of open trench shall be related closely to the rate of pipe laying. All excavation shall be made in open trenches. All excavation, trenching, and related sheeting, bracing, etc., shall comply with the requirements of OSHA excavation safety standards (29 CFR Part 1926.650 Subpart P), and H.B. 1569 of the 71st Regular Legislative Session. Wherever compaction requirements are referred to herein it shall refer to Standard Proctor Density as determined by ASTM D 698. Prior to the start of work the Contractor is required to submit his/her proposed method of backfilling and compaction to the Engineer for review.

Bid Results

Water / Sewer

$89,331.00

Public - City

Site Work

10

1

2

8

Subscribe For Documents

92 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
363
Active Projects
167
Bidding Soon
3,824
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2021

February 22, 2021

Project location map

To Be Determined, Princeton, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.