BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Atlanta, Georgia. Conceptual plans call for the renovation of a 32,127-square-foot, three-story above grade educational facility.

This project has been Abandoned. The Fulton County Schools is seeking a qualified and experienced firm to provide Construction Services for Hapeville K-8 Conversion located at 3440 North Fulton Avenue, Hapeville GA 30354. Proposal Documents may be obtained Monday through Friday from: Mark Videkovich, Goodwin, Mills & Cawood, Inc. 6120 Powers Ferry Road NW, Suite 350 Atlanta, Georgia 30339 Phone: 770-919-5052 Fax: 770-955-1064 Email: mark.videkovich@gmcnetwork.com Documents will be sent through e-mail request only. Questions regarding the Request for Proposal process should be directed to Angela R. Young, Executive Director, Contracting via facsimile at (470) 254-1248 or email cpcontracts@fultonschools.org. Only questions received by Wednesday, January 13, 2021 by 4:00 p.m. (per the FCS Contracting time clock) will be considered. IMPROVED INDOOR ENVIRONMENTAL QUALITY - Replace domestic water piping system in Building 2015. - HVAC equipment replacement including select roof mounted packaged units INTERIOR AESTHETIC IMPROVEMENTS - Renovate and layout new middle school music suite inside auditorium. - Renovate and layout new elementary music suite in former classrooms - Renovate and layout new CTAE in current music suite. - Consolidate pair of classrooms into CTAE lab. - Consolidate pair of classrooms into science lab. -Renovate Media Center. -Add student lockers for grades 6-8 and athletic lockers in gym. -Replace VCT in basement of Building 2011. -Repaint interior CMU corridor walls in Building 2011. - Replace interior doors and hardware in various locations. - Renovate clinic space. - Demolish teacher dining room to enlarge cafeteria space. - Kitchen renovation--consolidation of spaces and additional equipment. - Renovate teacher work room into elementary art room. EXTERIOR AND SITE MAINTENANCE IMPROVEMENTS - Replace sidewalk at parent pick-up and to walking track. - Replace multiple chain link fence locations. - Replace 500kVA Transformer. - Replace canopy roof at bus and parent drop off. - Replace exterior metal doors at various locations. - Investigate ponding and flooding at various locations Contractor shall commence the Work on the date stated in the Owners Notice to Proceed and shall furnish sufficient forces, facilities, and materials, and work such hours (including extra shifts, weekend, and overtime operations), so as to achieve Substantial Completion of the entire Work by the Substantial Completion Date of July 28, 2022

Project Abandoned

Educational

$15,000,000.00

Public - County

Renovation

137

30

4

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
50
Bidding Soon
1,504
All Active Projects
571
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.