BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a clubhouse / community center in Orlando, Florida. Completed plans call for the construction of a 26,000-square-foot clubhouse / community center; and for site work for a clubhouse / community center.

Midtown Orlando Center for Accelerated Skills Training Tenant Build-Out Phase I and Phase II The project will consist of a tenant build-out of approximately 26,000 square feet in an existing industrial, new shell space for the Midtown Orlando Center for Accelerated Skills Training (MCAT) to be located at: 3499 Wd Judge Drive, Building 3437, Orlando, FL 32808. The proposed space is classified as business occupancy and is to include three (3) classrooms, an administrative suite, instructor workstations, breakroom, restrooms and support spaces, as well as trades teaching area for accelerated skills training programs. Improvements will include, but are not limited to, new interior partition walls/drywall, interior acoustical ceiling tile, light fixtures, electrical data, HVAC equipment/ductwork, interior finishes, and additional needs specific to each trade teaching area, such as eye wash stations, compressed air, etc. No exterior site work is proposed Question End Date 1/12/2021 10:00 AM

Bid Results

Clubhouse / Community Centers

$1,866,967.00

Public - County

New Construction, Site Work

94

32

47

7

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
387
Active Projects
170
Bidding Soon
2,782
All Active Projects
1,108
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 12, 2021

March 16, 2021

img_map_placeholder

3499 Wd Judge Dr, Orlando, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.