BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 9, 2022 at 7:00 PM

Updated January 25, 2024

Site work for a water / sewer project in Milo, Alberta. Completed plans call for site work for a water / sewer project.

MCGREGOR RESERVOIR SHORELINE EROSION PROTECTION - PHASE 1 - MILO CARSELAND BOW RIVER HEADWORKS SYSTEM APPROXIMATE QUANTITIES: 1 LUMP SUM MOBILIZATION AND DEMOBILIZATION 1 LUMP SUM CARE OF WATER 1 LUMP SUM MINISTERS SITE OFFICE 600 METRE TEMPORARY CONSTRUCTION FENCE 1 400 CUBIC METRE TOPSOIL STRIPPING 1 LUMP SUM SITE CLEARING AND GRUBBING 8 800 CUBIC METRE COMMON EXCAVATION 2 600 CUBIC METRE BEDDING GRAVEL FILL ZONE 5B 8 700 CUBIC METRE RIPRAP FILL ZONE 6B 1 400 CUBIC METRE TOPSOIL PLACEMENT 1 500 SQUARE METRE EROSION CONTROL BLANKET Contractor to supply all materials.

Bid Results

Water / Sewer

$2,475,407.00

Public - State/Provincial

Site Work

86

19

16

3

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
9
Bidding Soon
212
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2022

December 6, 2022

Project location map

Multiple Locations, Milo, AB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.