BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a municipal facility in Hartford, Connecticut. Design plans call for the demolition of a municipal facility; for the construction of a 280,000-square-foot municipal facility; and for site work for a municipal facility.

NEW COURTHOUSE IN HARTFORD, CT: ARCHITECT-ENGINEER SERVICES REQUEST FOR STAGE I SUBMISSIONS GSA Design Excellence Solicitation for Lead Design Architect C- Solicitation Region: Region 1-New England City: Hartford, CT Contracting Officer: David Mark Phone Number: (617) 531-9092 PROJECT: New Federal Courthouse in Hartford, CT BUILDING TYPE: New Construction Courthouse CLIENT AGENCY: US Courts, US Marshals Service, US Attorneys Office, United States Senate, GSA SIZE: Approximately 280,000 GSF including 66 indoor secured parking spaces. BUDGET: The estimated cost for construction of the new courthouse is between $180 million and $220 million. FUNDING: Design Funds are currently appropriated. GEOGRAPHIC LIMITATION: A/E firms are advised that at least 35% of the level of contract effort must be performed within 130 miles of downtown Hartford, CT. SMALL BUSINESS SET ASIDE: This solicitation is being issued as "Unrestricted Full and Open." No set-aside to small businesses is anticipated. If the successful offeror is a large business, GSA will require it to submit an acceptable Small Business Subcontracting Plan prior to award. Continuing a legacy of outstanding public architecture, the General Services Administration (GSA) Design Excellence Program seeks to commission our nation's most talented designers and artists to design federal buildings of outstanding quality and value. These projects are to demonstrate the value of true integrated design that balances aesthetics, cost, constructability, and reliability; create environmentally responsible and superior workplaces for civilian federal employees; and give contemporary form and meaning to our democratic values. In this context, GSA announces an opportunity for Design Excellence in public architecture for performance of architectural/engineering design in accordance with GSA quality standards and requirements. As required by law, all facilities will meet federal energy goals and security requirements. The facility will be designed in imperial units. This project will be LEED gold and SITES silver certified at a minimum. PROJECT DESCRIPTION The project is for the design of a new federal courthouse in Hartford, CT. Currently, Court operations are conducted in the A.A. Ribicoff Federal Building and Courthouse in Hartford, CT, as well as in two additional federal courthouses in Connecticut: the Richard C. Lee Courthouse in New Haven and the Brien McMahon Federal Building and U.S. Courthouse in Bridgeport. The A/E shall design a new courthouse that will contain approximately 281,000 gross square feet of office, storage, and special use space and 66 indoor parking spaces. This facility is to be designed to accommodate all court functions, 11 specific court rooms with 18 separate chamber facilities, US Court of Appeals, US District and US Bankruptcy Courts, US Probations and Pretrial Offices, the US Marshals Service (USMS) and space for the US Attorneys Office (USAO) and Congressional suite. The proposed site for the new project is currently in selection and will consist of a parcel of land that will be in the range of 2-5 acres located in the City of Hartford or its metropolitan area. This new project will call for the design of a new federal courthouse of outstanding quality and value in accordance with GSA's Guiding Principles of Federal Architecture and Design Excellence Program. The goals of this project will be as follows: Design a new federal courthouse of outstanding quality and value in accordance with GSA's Guiding Principles of Federal Architecture and Design Excellence Program. Create a facility that becomes a respected landmark within Downtown Hartford. Design the new courthouse to contribute to the community and be capable of servicing the community quickly and efficiently. Deliver a project within the project schedule and budget while complying with GSA P100, US Courts Design Guide and USMS P64. Ensure the facility meets the future needs of the US Courts, USMS, GSA, USAO, FPD and a Congressional Office in the areas of functionality, operation, security, circulation and efficiency. Construct a facility that will be cost-effective to operate and maintain. Design and construct a new courthouse to express the dignity and vision of the District of Connecticut. Use materials which will express the purpose of the institution and last the intended life of the new courthouse. Provide the public, jurors, judges and staff with an inviting and commodious experience when working and/or visiting the new courthouse. Design a new courthouse which will allow for judges to move freely and safely to all the courtrooms and have a collegial work environment. Provide the court staff office spaces with natural light and communal work areas. Create outdoor areas which can be used daily by the court and public or for special events. Depending on availability of funds, GSA intends to award a Construction Manager as Constructor (CMc) contract before the beginning of the design development phase. The CMc will work hand-in-hand with the Contractor in order to assess constructability of the design as well as provide input and costing throughout the design development and construction document phases. The estimated project duration for design is estimated at twenty-four (24) months, with construction taking thirty-six (36) months. SCOPE OF WORK The scope of professional services will require at a minimum: professional architectural, landscape architectural, engineering, interior design, and related consulting services for concept design documents, design development documents, construction documents, specifications, cost estimates, value engineering services, computer-aided design and drafting (CADD), and post-construction contract services (PCCS) for a new federal courthouse that includes the construction of a new building and related systems, secured parking, and site development. The project is also to include GSA design standards for secure facilities; conformance to the P100 (Facility Standards for Public Buildings), including LEED and SITES certification; and customer agency requirements. SELECTION PROCESS This is a request for qualifications (RFQ) of A/E firms/lead designers interested in contracting for this work. The A/E firm as used in this RFQ means an individual, firm, partnership, corporation, association, or other legal entity permitted by law to practice the profession of architecture or engineering that will have contractual responsibility for the project design. The lead designer is the individual or the team of designers who will have primary responsibility to develop the concept and the project design. The lead designer will also be involved in commissioning an artist or artists for this project and in assisting with the successful integration of work(s) of art into the architectural design. A/E firms are advised that at least 35% of the level of contract effort must be performed within 130 miles of downtown Hartford, CT. The A/E firm will address the contractual relationship with the lead designer and project team in Stage II. The A/E selection will be completed in two stages as follows: In Stage I, interested lead designers and associated A/E firms will submit portfolios of accomplishment that establish the design capabilities of the lead designer and design firm. In Stage II, shortlisted lead designer-A/E teams will be interviewed. Stage I All documentation shall be printable in an 8 1/2" x 11" format with a minimum 10 point text font size. No hard copies are required; A reproducible electronic copy of all submitted material shall be provided via email to david.mark@gsa.gov. The portfolio should include the following: a cover letter referencing the SAM.GOV announcement and briefly describing the firm and its location, organizational makeup, and noteworthy accomplishments; Standard Form 330 Architect Engineer Qualifications Part II; and responses to the submission requirements and evaluation criteria listed below. An A/E Evaluation Board consisting of a private sector peer and representatives of the client and GSA will evaluate the submissions. After review of the submitted material, the selection board will establish a shortlist of three to six firms. Identification of team members, other than the lead designer(s), is not required at this stage. Consultant and "production firm" (if different from the design firm) information should not be included in the Stage I portfolio. Submission Requirements And Evaluation Criteria: (1)PAST PERFORMANCE ON DESIGN (35%): The A/E firm(s) will submit a portfolio of not more than five projects completed in the last ten years (maximum of five pages per project). The narrative shall address the design approach with salient features for each project and discuss how the client's program, functional, image, mission, economic, schedule, and operational objectives were satisfied by the overall design/planning solution. It should comment on the relevance of submitted projects similar to the size and scope of the Hartford Federal Courthouse. This section of the submission should include tangible evidence such as certificates, awards, peer recognition, etc. demonstrating design excellence, and should provide a client reference contact for each project, including name, title, address, email, phone, and fax numbers. A representative floor plan, a site plan, a building section, or other appropriate drawing, and a minimum of two photographs must be included for each project. (2)PHILOSOPHY AND DESIGN INTENT (25%): In the lead designer's words (maximum of two pages), as related to this project, state: the parameters of an overall design philosophy; his/her approach to the challenge of public architecture and related issues that would be seen in similar type public building projects. (3)LEAD DESIGNER PROFILE (15%): Submit a biographical sketch (maximum of three pages) including education, professional experience, and recognition for design efforts inclusive of the portfolio examples. Identify and describe areas of responsibility and commitment to each project. (4)LEAD DESIGNER PORTFOLIO (25%): Submit a portfolio representative of the lead designer's ability to provide design excellence. Address his or her participation in each project. If a single designer, submit a portfolio of up to three projects completed in the last ten years (maximum of five pages per project). If the lead designer is a team, submit graphics and a description of up to two projects from each lead designer or lead design discipline. The narrative shall address the design philosophy with salient features for each project and discuss how the client's program, functional, image, mission, economic, schedule, and operations and maintenance objectives were satisfied by the overall design/planning solution. Include tangible evidence such as certificates, awards, peer recognition, etc., demonstrating design excellence. Where there is duplication with criteria (1) Past Performance on Design, the lead designer shall address his or her participation in the project. Stage II The shortlisted lead designers and associated A/E firms will be notified and asked to submit more detailed information indicating each member of the design team, including all outside consultants. Sufficient time will be provided for the lead designer and associated A/E design firm to establish its team. The firms will be required to complete Standard Form 330 Architect Engineer Qualifications Parts I and II that reflect the entire design team. The government will establish the detailed evaluation criteria and the date that these submittals are due and provide the selection criteria for the interviews along with the Stage I shortlist announcement. The board will interview each team. Candidates should be prepared to discuss all aspects of the criteria indicated above and evaluation criteria as established for Stage II, and demonstrate their ability to fulfill all project requirements. Emphasis will be placed on the lead designer-A/E team's understanding of the unique aspects of the project, their design philosophy, project management process, and quality assurance plan. Responses to the evaluation criteria and interview questions will be used to rank the lead designer-A/E teams. IMPORTANT INFORMATION FOR STAGE I SUBMITTALS Firms having the capabilities to perform the services described in this announcement are invited to respond by submitting Standard Form 330 Architect Engineer Qualifications Part II which must not be dated more than twelve (12) months before the date of this synopsis along with letter of interest, the portfolio TO, and all other Stage I Submission requirements to: Contracting Officer: David Mark Delivery Address: Email to david.mark@gsa.gov Phone number: (617) 531-9092 ALL STAGE 1 SUBMISSIONS ARE DUE by 3:00 PM EASTERN DAYLIGHT TIME ON WEDNESDAY, SEPTEMBER 21, 2022. SHORTLISTED FIRMS WILL BE NOTIFIED OF THE STAGE II SUBMISSION DUE DATES ONCE THE SELECTION PROCESS IS COMPLETE. THOSE FIRMS NOT MAKING THE SHORTLIST WILL ALSO BE NOTIFIED. A total of one (1) reproducible electronic copy should be submitted with a minimum 10 point text font size. The electronic copy may be submitted by email to david.mark@gsa.gov. All submitted materials must be clearly marked with the following information: 1.) solicitation number/title, 2) due date, 3) closing time. Late responses are subject to FAR 52.214-7. The Contract will be procured under the Brooks A/E Act, FAR Part 36, and GSAM Part 536. The government will not allow payment for travel, living expenses, computer time or hookups for the prime or the consultants during the selection process. This is not a request for proposals. PRE-SUBMITTAL MEETING A virtual pre-submittal meeting for private-sector professionals interested in this project will be held on Monday, June 27, 2022 at 3:00 PM EDT. To register for this meeting please email david.mark@gsa.gov. The Contracting Officer will send a calendar invitation to registrants. The purpose of this meeting is to clarify the Design Excellence process, the application process, and the nature of the project. At the meeting, it should be stressed that the lead designer can be an individual or a collaboration among individuals. Only Stage I submissions are being requested at this time. For more information on the GSA Design Excellence Program, please visit gsa.gov/design excellence. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Design

Municipal

$270,000,000.00

Public - Federal

Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
479
Active Projects
318
Bidding Soon
4,384
All Active Projects
1,830
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2023

img_map_placeholder

Main St, Hartford, CT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.