BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Detroit, Michigan. Completed plans call for site work for a water / sewer project.

Seagull Habitat Modification project at WRRF is intended to address the Seagull nesting challenges at this site by removing the existing grass/asphalt/gravel and planting native grasses. This project will also help to address the issue of water ponding at the Electrical Substation at this property by building a swale. The Work shall include: 1) Removal of the top 4-inches of existing topsoil in the unpaved areas and replace with amended existing soil/topsoil mix per existing and proposed soil profiles. 2) Removal of the top 6-inches of existing topsoil in the gravel and asphalt pavement areas and replace with amended existing soil/topsoil mix per existing and proposed soil profiles. 3) The finished grade shall match existing grade. 4) Offsite disposal of soil per federal, state and local environmental requirements. 5) Planting of native tallgrass prairie seed mix per Landscape Construction Notes and Specifications. If necessary, seeding shall be completed before the seagull inhabit the area. 6) Providing positive drainage (swale) along the eastern border with a slope of at least 0.5% so that no water shall be ponding near EB 4. 7) Working with care so that EB 4 is not damaged, along with the 6-inch water valve box and other utilities in the area. 8) Securing and payment for all permits (if any), and any associated fees necessary for the proper execution and completion of the Work. Questions : All questions and inquires must be directed under the solicitation number and title, open opportunities messages tab, Opportunity Q&A at https://glwater.bonfirehub.com/portal by the following: Date: Friday, March 26, 2021 Time: 12:00 noon (Eastern Standard Time) Substantial Completion Two months from the date when the Contract Time commences to run. Liquidated Damages: Substantial Completion Amount Per Day $250 Completion Four months from the date when the Contract Time commences to run. Liquidated Damages: Final Completion Amount Per Day $250 GLWA reserves the right to waive any minor deviations, irregularities and informalities in the response

Award

Water / Sewer

$271,160.00

Public - State/Provincial

Site Work

8

1

2

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
112
Bidding Soon
1,374
All Active Projects
467
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2021

May 12, 2021

img_map_placeholder

9300 W Jefferson Ave, Detroit, MI

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.