BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2021 at 8:00 PM

Updated May 14, 2025

Demolition, site work and new construction of a detention facility in Swanquarter, North Carolina. Completed plans call for the demolition of a 3,224-square-foot detention facility; for the construction of a detention facility; and for site work for a detention facility.

DEMOLITION ONLY. Remediate a modular classroom/dorm to remove interior finishes as indicated including gypsum board, lighting fixtures, ductwork, fire alarm system, and through-wall PTAC HVAC equipment in accordance with "Mold Remediation Plan" issued by Matrix Heath & Safety Consultants, LLC, including equipment, qualifications, pertinent licenses to perform the work, and dispose of the demolished materials properly. Bids will be received for a single prime contract. All proposals shall be lump sum. NCDPS requires that, for construction contracts with a value of $5000 or greater, the contractor shall comply with the document Guidelines for Recruitment and Selection of Minority Businesses for Participation in State Construction Contracts including Identification of Minority Business Participation, Affidavits A, B, C, and D, and Appendix E. Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days. The owner reserves the right to reject any or all bids and to waive informalities. Project Location: Hyde Correctional Institution, 620 Prison Rd, Swanquarter, NC 27885 1. Demolition: The protection of structure and demolition of interior finishes and hvac, electrical and fire alarm systems contaminated with mold and their proper removal and disposal; removal for storage and reuse items as indicated in the Contract Documents; cleaning of remaining structure as indicated in "Mold Remediation Plan", Dated August 17, 2020, issued by Matrix Health & Safety Consultants, LLC; 2. Reconstruction: The rebuild of the interior systems and finishes, to include insulation, gypsum wall board, painting and coating finishes, wood trim, lighting, electrical panels, ductwork and reinstallation of owner's stored items. The time for completion of the Work shall be 30 consecutive calendars days

Award

Jails / Prisons

$19,500.00

Public - State/Provincial

Demolition, New Construction, Site Work

24

18

4

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
25
Bidding Soon
356
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2021

March 15, 2021

Project location map

620 Prison Rd, Swanquarter, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.