BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a civil project in Garden Grove, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

**As of 3/4/2021 Start is March/2021, and completion is February 2022. The Orange County Water District is currently accepting bids for the Garden Grove Wells 21, 23, 28, 29 and 30 PFAS Water Treatment Plants. The work includes but is not limited to the following: The Garden Grove Wells 21, 23, 28, 29, and 30 PFAS Water Treatment Plants project generally consists of the following major components. Take delivery of and install District furnished Dual Media Pressure Vessel PFAS water treatment systems at four existing well sites including pressure testing, disinfection, and bacteria testing. Take delivery of and install District furnished Ion Exchange resin into Dual Media Pressure Vessels. Furnish and install prefilter systems, booster pumps, and booster pump building for the water treatment systems. Water Treatment Plant Structural Concrete: Construct structural concrete for the water treatment systems. Connect the water treatment systems to the existing wells and distribution systems: Furnish and install cement mortar lined and epoxy coated above ground and cement mortar lined and coated buried pipeline from the wells to the water treatment systems and from the water treatment systems to the distribution system points of connection. Complete all Paving and Site Improvements including, but not limited to: Grading, Concrete Paving, Asphalt Paving, Fencing, and Drainage at the four well sites. Electrical and Instrumentation: Furnish and install and/or modify electrical and instrumentation equipment and facilities at the well sites for the new water treatment systems and pumps. Instrumentation and control systems shall be integrated with the existing SCADA system. Provide all commissioning and start-up-services at all four sites. The Contractor is required to demonstrate its experience of successfully completing construction of two separate pressurized water treatment projects within the past 10 years such as, but not limited to, granular activated carbon, ion exchange, surge tanks, membrane filtration, and/or pressurized filtration. For questions about this bid, please contact Ryan Bouley at (714) 378-8207 or via email. Engineer's Estimate: $15,000,000

Award

Water / Sewer

$12,812,000.00

Public - County

New Construction, Site Work

143

1

15

7

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
107
Bidding Soon
2,365
All Active Projects
1,030
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2021

March 5, 2021

img_map_placeholder

Multiple Locations, Garden Grove, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.