BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2024 at 8:00 PM

Updated April 1, 2024

Site work and paving for a civil project in Las Cruces, New Mexico. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Brahman Diversion Channel construction (Dragonfly). To plan, design, acquire, construct and equip a flood-control structure approximately four miles north of U.S. Highway 70 at Holman Road. To date, the project has received $1 million in capital outlay funding for property acquisition, archeological studies, environmental studies, planning, design and construction. As of March 29, 2024, per owner, the Brahman/Dragonfly Diversion channel is currently under construction. A design team and general contractor have been identified.

Under Construction

Water / Sewer

$8,404,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
15
Bidding Soon
327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2023

Project location map

US-70, Las Cruces, NM


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.