BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2021 at 7:00 PM

Updated January 26, 2024

Site work, paving and outdoor lighting for a mixed-use development in Mulberry, Florida. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Counties: Polk Road Name: SR 37 Limits: From Carter Rd to Fitzgerald Rd Project(s): 44477915201(*) Federal Aid No: D120046B Total Roadway Length: 2.368 Miles Contract Days: 270 Total Bridge Length: 0.000 Miles Total Proposal Length: 2.368 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days (Aqui Time) The improvements under this contract consist of sidewalk construction, milling and resurfacing, drainage improvements, lighting, signalization, highway signing and other incidental construction along SR 37 from Carter Road to Fitzgerald Road in Polk County. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 005 Sidewalk/Milling and Resurfacing/Pedestrian Traffic Signals The Improvements under this Contract consist of sidewalk construction, milling and resurfacing, drainage improvements, lighting, signalization, highway signing and other incidental construction along SR 37 from Carter Road to Fitzgerald Road in Polk County.

Award

Roads / Highways

$2,947,759.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

301

5

2

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
347
Active Projects
153
Bidding Soon
2,616
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2021

March 29, 2021

Project location map

FL-37, Mulberry, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.