BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Fort Worth, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; and water / sewer project.

A Purchasing Division staff person or the Project Manager will be available to accept the bid and provide a time stamped receipt; or 3. If the bidder desires to submit the bid on a day or time other than the designated Thursday, the bidder must contact the Purchasing Division during normal working hours at 817-392-2462 to make an appointment to meet a Purchasing Division employee at the South End Lobby of City Hall located at 200 Texas Street, Fort Worth, Texas 76102, where the bid(s) will be received and time/date stamped as. The general public will not be allowed in the City Council Chambers. In addition, in lieu of delivering completed MBE forms for the Project to the Purchasing Office, bidders shall e-mail the completed MBE forms to the City Project Manager no later than 2:00 P.M. on the second City business day after the bid opening date, exclusive of the bid opening date. GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: 10,800 SY asphalt roadway removal, 27,000 SY of 10" concrete pavement, 2,650 LF RCP pipe (18" to 36"), 995 LF RCB (4X3 to 7X4), street lighting, 400 LF 12" waterline, and reroute 130 LF 30" water main. PREQUALIFICATION The improvements included in this Project must be performed by a contractor who is pre-qualified by the City at the time of bid opening. The procedures for qualification and pre-qualification are outlined in the Section 00 21 13 - INSTRUCTIONS TO BIDDERS. DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained on-line by visiting the City's electronic document management and collaboration system portal. The presentation given at the prebid conference and any questions and answers provided at the prebid conference will be issued as an Addendum to the call for bids. If a prebid conference is not being held, prospective bidders can e-mail questions or comments in accordance with Section 6 of the Instructions to Bidders referenced above to the Project manager(s) at the e-mail addresses listed below. Emailed questions will suffice as "questions in writing" and the requirement to formally mail questions is suspended. If necessary, Addenda will be issued pursuant to the Instructions to Bidders.

Award

Roads / Highways

$5,605,459.00

Public - City

Outdoor Lighting, Paving, Site Work

85

1

2

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
74
Bidding Soon
3,530
All Active Projects
1,288
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2021

March 15, 2021

img_map_placeholder

Multiple Locations, Fort Worth, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.