Site work for a mixed-use development in Anchorage, Alaska. Completed plans call for site work for a municipal facility; and bridge / tunnel.

Phase I of the project consists of approximately 20 acres of clearing, placement of approximately 180,200 tons of fill material, approximately 2,500 tons of unusable excavation and disposal at Anchorage Regional Landfill, placement of geotextiles, temporary culverts, temporary over-height detection warning system, and BMPs. ESTIMATED CONSTRUCTION COST: Between: $3,000,001 - $5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Requests for interpretation or clarification of the bidding Documents shall be made in writing to the Purchasing Office (wwpur@muni.org). The Municipality of Anchorage reserves the right to reject any and all bids and to waive any informalities in the bids. All proposed Work is located within the Municipality of Anchorage corporate limits and is more particularly located on the design drawings. The Work included under this Contract consists of furnishing all labor, materials, equipment, supervision, and other facilities necessary to successfully complete the Work set forth in the Drawings and Specifications. The Work included under this Contract consists of, but is not limited to: Clearing Excavation Placement of fill material Geotextile Temporary culverts Placement of BMPs Removal and replacement of fencing Soil stabilization measures Temporary truck over-height detection system Interim maintenance of the site until Phase II This Project shall be Substantially Completed within one hundred eight (180) calendar days after the Notice-to-Proceed is issued. The Contract Completion date shall be within fifteen (15) calendar days after the Substantial Completion letter is issued. The total contract days for this Project is one hundred ninety-five (195). The Owner may withhold from any progress payment the sum of $1,000 per day as Liquidated Damages for each and every calendar day that the Substantial Completion Date is delayed beyond the Contract Completion Date. The Owner may withhold out of any progress payment the sum of $500 per day as Liquidated Damages for each and every calendar day that the Final Acceptance Date is delayed beyond the Contract Completion Date. If no money is due Contractor, the Owner shall have the right to recover said sums from Contractor, the Surety, or both.

GC Bidding

Bridges / Tunnels

$5,000,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
128
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

February 3, 2025

img_map_placeholder

5701 Northwood Dr, Anchorage, AK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.