Site work and renovation of a water / sewer project in Ridgeway, Wisconsin. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of March 23, 2021, project was awarded to Seven Brothers Painting, Inc. (Contract 1) and L.W. Allen & Altronex (Contract 2). The Project consists of completing the necessary repairs and modifications to the existing elevated steel water storage tank, and sandblasting and repainting the interior and exterior of the elevated steel spheroid water storage tank. Bids will be received for two (2) prime Contracts. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. There are no prevailing wage rates for this Project. The Village of Ridgeway encourages Minority-owned Business Enterprises (MBE), Women's Business Enterprises (WBE), Disadvantaged Business Enterprises (DBE), and Small Businesses in Rural Areas (SBRA) to submit bids. A municipality, in awarding prime contracts, and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of participation for MBE/WBE utilization in accordance with s.NR 162.09(3), Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. Bidding Document: The Issuing Office for the Bidding Documents is: Delta 3 Engineering, 875 S. Chestnut Street, Platteville, WI 53818, (608) 348-5355. Bidding Documents will be made available to Prospective Bidders on or about Monday, January 4, 2021. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 a.m. and 4:30 p.m. CST. Bidding Documents may also be examined at the office of the Village of Ridgeway, 113 Dougherty Court, Ridgeway, WI 53582, on Mondays through Fridays between the hours of 9:00 a.m. and 3:00 p.m. CST. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bid Bond: No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least five percent (5%) of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the Bidder as soon as the contract is signed. If after 15 days the Bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. Bids may not be withdrawn within 90 days after the date of the bid opening. The OWNER reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary by the OWNER, and the same shall in no way affect or make void the contract, except that additions to, or deductions from, the contract price will be appropriately made. The OWNER reserves the right to waive any informalities, or to reject any or all bids, or any part of a bid, and to award the Contract to the Bidder, who in the judgment of the OWNER, will best serve the interest of the OWNER. A pre-bid conference will not be conducted, and bidders will not be prequalified Bid Result CONTRACT #1 V & T Painting, LLC $269,000 CONTRACT #2 $60,000 The Osseo Construction

Award

Water / Sewer

$408,585.00

Public - City

Renovation, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
29
Bidding Soon
592
All Active Projects
273
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2021

February 22, 2021

img_map_placeholder

Main Street, Ridgeway, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.