Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 17, 2021 at 8:00 PM

Updated January 26, 2024

Demolition, site work and new construction of a mixed-use development in Southington, Connecticut. Completed plans call for the demolition of a water / sewer project; and for the construction of a pre-engineered storage facility.

***As of May 17, 2021 project has not been awarded yet. A timeline for award has not yet been established. The work consists of replacing a dry pit wastewater pump station with a prepackaged precast concrete submersible type pump station, installation of outdoor generator, electrical enclosures, and site features, and demolition of an above-grade building and wet well. A bid deposit shall be furnished in accordance with the Instructions to Bidders, in the form of a certified check or a bid bond, on form provided in Section 00430 of the Project Manual, for 10% of the amount of the bid, to accompany each proposal. Bidders shall be Department of Administrative Services (DAS) pre-qualified under the category of Water Treatment Plants under C.G.S. 4b-91 as amended. Bidders are advised that both the DAS Prequalification Certificate and Update (Bid) Statement must accompany the Bid proposal for projects estimated to exceed $500,000. Failure to supply these forms with the Bid will result in rejection of the Bid. The time period for holding Bids is 120 days, Saturdays, Sundays and legal holidays excluded, after opening of Bids. The Work will be substantially completed within 365 days from the date of the Notice to Proceed and completed and ready for final payment If the Successful Bidder fails to furnish the required contract security within 15 days after the Notice of Award and execute the Agreement within 5 days after receipt from Owner, Owner may annul the Notice of Award and the Bid deposit of that Bidder will be forfeited to Owner as liquidated damages for such failure.

Bid Results

Water / Sewer

$676,412.00

Public - City

Demolition, New Construction, Site Work

19

17

7

Subscribe For Documents

86 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,176
Active Projects
510
Bidding Soon
7,585
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2021

May 31, 2021

Project location map

806 S Main St, Southington, CT


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed