BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a water / sewer project in Storm Lake, Iowa. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Lift Station Replacement - Base Bid Replacement of the existing lift station with a concrete wet well structure, two 1250 GPM submersible effluent pumps, process piping, controls, and all other miscellaneous work to complete the project. Lift Station Replacement - Alternate Bid All items from the base bid will apply, with the addition of a stationary generator. The general project location is as follows: In the east right-of-way of Hwy St. and in Radio Park, Storm Lake, IA. Each proposal shall be accompanied by a cashier's check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a state-chartered or federally chartered credit union, or a bidder's bond with corporate surety satisfactory to the City in an amount equal to Ten percent (10%) of the total amount of the proposal. If bid bond is submitted, it must be in the form provided in these specifications. Said check or share draft may be cashed, or the bid bond forfeited as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within ten (10) days of issuance of a Notice of Award and post bond satisfactory to the City insuring the faithful fulfillment of the contract and maintenance of said improvements as required by law. The bid bond should be executed by a corporation authorized to contract as a surety in the State of Iowa, and must not contain any conditions either in the body or as an endorsement thereon. The successful bidder will be required to furnish a corporate surety bond in an amount equal to one hundred per cent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, the payment for materials used in the project and the maintenance of said improvements in good repair for not less than one (1) year from the time of acceptance of said improvements by the City. The City reserves the right to defer acceptance of any proposal for a period not to exceed sixty (60) calendar days from the date of receipt of bids. The City reserves the right to reject any or all bids and to waive informalities. Payment of the cost of said project will be made from such cash funds of the City as may be legally used for said purpose at the discretion of the City, including but not limited to, the net revenues of the Wastewater Department, the proceeds from the sale of Revenue or General Obligation Bonds, and/or the proceeds from the sale of warrants, as authorized by Section 384.57 of the Code of Iowa, made payable from any or all of the abovementioned sources. The Contractor will be paid ninety-five per cent (95%) of the Engineer's estimate of the value of acceptable work completed at the end of the preceding month. Final payment will be made not less than thirty-one (31) days after completion of the work and acceptance by the City, subject to the conditions and in accordance with the provisions of Chapter 573 of the Code of Iowa. No such final payment will be due until the Contractor certifies to the City that the materials, labor, and services involved in the final estimate have been paid for in accordance with the requirements stated in the specifications. The City of Storm Lake is exempt from paying Sales and Use Tax and will supply Contractor with an "Iowa Sales Tax Exemption Certificate" and an authorization letter to allow the Contractor to buy equipment and material for the project tax free. Liquidated damages in the amount of $500 per calendar day will be assessed for each day that the work shall remain uncompleted after the above referenced completion date with due allowance for extensions of the contract period due to conditions beyond control of the Contractor.

Award

Water / Sewer

$494,028.00

Public - City

Demolition, New Construction, Site Work

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
15
Bidding Soon
250
All Active Projects
75
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2021

March 8, 2021

img_map_placeholder

Hwy St & E Lakeshore Dr, Storm Lake, IA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.