EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 23, 2021 at 7:00 PM

Updated January 26, 2024

Renovation of a clubhouse / community center in West Milwaukee, Wisconsin. Completed plans call for the renovation of a clubhouse / community center.

Section 119.16(4) Wisconsin Statutes in accordance with plans and specifications for the following work: All contractor(s) and subcontractors(s) are subject to the current livable wage rate, in accordance with the City of Milwaukee Ordinance 310-13. Per 2015 WI Act 55, prevailing wage rate laws have been repealed for all MPS Construction Projects beginning January 1, 2017. All questions should be submitted in writing prior to 12:00 PM on Thursday, January 21, 2021 to DFMSProcurement@milwaukee.k12.wi.us. BID GUARANTY TO ACCOMPANY BID: MPS Bid Bond, Certified or Cashier's Check: 10% of Contractor's Base Bid. ELECTRICAL SERVICE UPGRADE Audubon Multi-Plex 3300 S. 39th Street Milwaukee, WI 53215 MPS Property No. 041 MPS Project No. 5893 The HUB requirements for this project are 20% The COIN requirements for this project are 15% No questions may be answered after that date and time. No questions shall be answered verbally. No verbal information from any source is to be relied upon by any respondent in the development of their Bid. Written questions and responses will be documented by way of addenda, which will be forwarded to all bidders. Each bid shall be for a fixed lump sum. Audubon Multi-Plex project information page from which bid documents were obtained. Submit bid forms per Instructions to Bidders, Article B-5 of the Specifications. Plans and specifications will be loaned to a prospective bidder upon receipt of the deposit listed, which deposit will be returned upon surrender of the plans and specifications in good condition. Bid documents must be returned only to A/E Graphics, Inc. The right is reserved to reject any or all bids or to waive informalities. Upon reasonable notice, efforts will be made to accommodate the needs of disabled individuals at the bid opening through sign language interpreters or other auxiliary aids.July 2 or July 5, 2021 (confirm with Project Manager)

Award

Clubhouse / Community Centers

$223,682.00

Public - City

Renovation

6

11

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Procedures
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Cleaning Devices
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
90
Bidding Soon
1,711
All Active Projects
606
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2021

May 31, 2021

img_map_placeholder

3300 S 39th St, West Milwaukee, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.