BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Ankeny, Iowa. Conceptual plans call for site work for a water / sewer project.

Improvements to address safety, capacity, functionality, sedimentation, erosion and associated issues within the Tributary to Four Mile Creek, east of St. James Place, between NE 47th Street and NE 54th Street. The improvements may include clearing and grubbing to remove flow impediments, reshaping the channel to establish stable slopes, reconnection to the floodplain, reestablishing the channel bottom, providing toe protection, repairing gully erosion, repairing undermined outlet structures, repairing and modifying an existing storm water detention basin and establishing native/wetland plantings. Permanent drainage easements may need to be acquired in conjunction with this project. The purpose of this project is to stabilize the channel, repair gully erosion, repair and modify a storm water detention basin and repair outlet structures which have caused safety and functionality concerns. The project costs are shown for the survey, concept plan and design work to be completed in 2022 and 2023 with construction of the project scheduled in 2024. As December 22, 2022, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

Conceptual

Water / Sewer

$2,220,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
104
Bidding Soon
1,161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

Project location map

Multiple Locations, Ankeny, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.