Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 22, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Ankeny, Iowa. Conceptual plans call for site work for a water / sewer project.
Improvements to address safety, capacity, functionality, sedimentation, erosion and associated issues within the Tributary to Four Mile Creek, east of St. James Place, between NE 47th Street and NE 54th Street. The improvements may include clearing and grubbing to remove flow impediments, reshaping the channel to establish stable slopes, reconnection to the floodplain, reestablishing the channel bottom, providing toe protection, repairing gully erosion, repairing undermined outlet structures, repairing and modifying an existing storm water detention basin and establishing native/wetland plantings. Permanent drainage easements may need to be acquired in conjunction with this project. The purpose of this project is to stabilize the channel, repair gully erosion, repair and modify a storm water detention basin and repair outlet structures which have caused safety and functionality concerns. The project costs are shown for the survey, concept plan and design work to be completed in 2022 and 2023 with construction of the project scheduled in 2024. As December 22, 2022, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available
Conceptual
Water / Sewer
$2,220,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2024
Multiple Locations, Ankeny, IA
Related To This Project
Ankeny, IA
--
Ankeny, IA
Bid Date: Feb 13 2024
Ankeny, IA
Bid Date: Sep 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
