BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in El Paso, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Answers furnished during the conference will not be official until verified in writing by the issuing office. You may address questions to the Procurement Analyst, Crystal Paz, in writing at pazcm@elpasotexas.gov. Any other communications, oral or in writing, with any person are strictly prohibited. Last Day for Bidders to Submit Written Questions May 19, 2021 The City reserves the right to accept or reject any or all bids and to waive formalities. In case of ambiguity in stating the price in the bid, the City reserves the right to consider the most advantageous construction thereof or to reject any bids. Also, the City reserves the right to accept the low bid based on the tabulation of any one, combination or all of the base bid(s), alternate bid(s) and/or, optional bid(s) based on the most advantageous project bid that is desired by the City Department involved and that the City Council in their sole judgment determines is the City's best interest and benefit. Wage Rates: Where there are similar wage rate classifications in wage determinations, the higher wage shall be paid. The contractor shall pay not less than the wage rate as determined by the Department of Labor, Wage and Hour Division and the City of El Paso The estimated project budget is in the range of $900,000.00 - 1,000,000.00 Bid Security: Each bid must be accompanied by a bid bond naming the City of El Paso as obligee and duly executed by the Bidder as principal and having as surety thereon a surety company approved by the Owner, in the amount of five percent (5%) of the total bid price (including base bid(s), option(s) and alternate(s). All Bid Bond Forms Must Contain Original Signatures (s). A Performance Bond for all public works contracts in excess of $25,000. The performance bond shall be for one hundred percent (100%) of the contract price and conditioned on the faithful performance of work in accordance with the plans, specifications, and contract documents. b. A Payment Bond for all public works contracts in excess of $25,000. The payment bond shall be for one hundred percent (100%) of the contract price for the protection and use of the payment bond beneficiaries who have a direct contractual relationship with the prime contractor or subcontractor to supply public work labor or material. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project consists of the removal and disposal of existing concrete driveways, sidewalks, handicap ramps, curb, and curb and gutter, etc., in preparation for the construction of a new walking trail and included amenities. The work also involves the construction of new concrete sidewalk, curb, curb and gutter, ADA wheelchair ramps, fiber reinforced concrete curb and asphalt trail, post and cable fencing, collapsible and fixed bollards, benches, picnic tables, stone columns and a stone sign wall, wayfinding signs, distance markers, trash receptacles, landscape and irrigation improvements along the Playa Drain Trail from Knights Drive to Yarbrough Drive as described through the plans and specifications. Prior to commencement of any work, the Contractor shall submit and obtain approval from City of El Paso, Capital Improvement Program Department, for the Sequence of Construction,Schedule of Work, and Haul/Waste Route to an approved disposal site. Traffic Control Plan must be submitted and approved, if applicable. Contractor shall provide written approved documentation from the owner or operator of the waste site. STP 2021(379)TP

Award

Roads / Highways

$435,247.00

Public - City

Paving, Site Work

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
8
Bidding Soon
255
All Active Projects
113
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2021

March 27, 2022

img_map_placeholder

Multiple Locations, El Paso, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.