BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Downers Grove, Illinois. Completed plans call for the renovation of a 32,300-square-foot educational facility.

As of March 19 2021 it is recommended that the Board award the base bid and alternate bid for the roof replacement project at Pierce Downer for a total cost of $1,203,850 to Elens & Maichin Roofing & Sheet Metal, Inc. The project encompasses approximately 32,300 square feet of roof area and approximately 2,652 square feet of remedial masonry work at 12 elevations on the building. Prime Roofing Contractors are encouraged to bring the appropriate sub-trades to the pre-bid meeting. It is the responsibility of the Bidder/Contractor to attend and sign-in at the pre-bid conference. Failure to attend and sign-in at the pre-bid conference shall result in the rejection of any bids submitted by those non-attending Contractors. The company name registered at sign-in must be the same as that of the company submitting the quotations. This will be the only time that the Contractors shall be allowed escorted access to the project site. Bid security in the form of a bid bond, certified check or cashier's check in an amount equal to ten percent (10%) of the base bid shall be submitted with the bid. Performance, Labor and Material Payment Bonds and Certificate of Insurance will be required from the successful Bidder. The Board of Education, Downers Grove Grade School District 58 reserves the right to reject any and all bids or parts thereof, to waive any irregularities or informalities in bidding procedures, and to award the contract in a manner best serving the interest of the School District. If during the time period of work, these rates change, the contractor shall be responsible for additional costs without any change to the contract amount. All Bidders must comply with Illinois Revised Statutes, 1981, Chapter 48, Section 39s-1 through 39s-12, requiring the payment of prevailing wage rates to all laborers, workmen and mechanics working on publicly-funded projects. If during the time period of work, these rates change, the contractor shall be responsible for additional costs without any change to the contract amount.

Award

Educational

$1,203,850.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
87
Bidding Soon
1,746
All Active Projects
760
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2021

March 1, 2021

img_map_placeholder

1436 Grant St, Downers Grove, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.