BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a playground / park / athletic field in Merrill, Wisconsin. Working plans call for the demolition of a playground / park / athletic field; for the construction of a 1,175-square-foot playground / park / athletic field; and for site work for a playground / park / athletic field.

n general, the work consists of: The removal of a toilet/shower building, removal of a toilet building with miscellaneous accessory structures, and the construction of a new toilet/shower building and the installation of a prefrabricated pit toilet buildings at Council Grounds State Park near Merril Wisconsin. The toilet/shower building has 1,715 square feet of enclosed areas and 289 square feet of covered area. Building construction has a poured concrete foundation and floor slab, masonry walls, wood roof trusses with metal shingles. Interior finishes are painted CMU and porcelean tile floor finish with associated plumbing, Ventilation and Electrical. Site preparation with demolition and new utilities and site development is included Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted The bidder is responsible for the sealed bid being delivered to the indicated location or email before the time specified for the bid submission. Third party delivery is entirely at the bidder risk A/E Contact: MSA Professional Services, Carter Arndt AIA, carndt@msa-ps.com, 608.355.8884 The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 3, 2017. This change does not affect the Federal Davis Bacon Act requirements. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders.

Final Planning

Playgrounds / Parks / Athletic Fields

$1,118,100.00

Public - State/Provincial

Demolition, New Construction, Site Work

54

28

2

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
18
Bidding Soon
661
All Active Projects
157
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 18, 2023

July 3, 2023

May 31, 2024

img_map_placeholder

N1895 Council Grounds Dr, Merrill, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.