Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Fort Wayne, Indiana. Design plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of March 13, 2023, an engineer firm has been selected. No estimated date for a bid date has been released. A timeline for construction has not been established. The closed solicitation has been included below for reference. Fort Wayne Public Works Division is seeking qualified engineering consultants to provide engineering services and assistance with the widening of Coldwater Road between E. Dupont Road and Union Chapel Road. The project will include a combination of typical three (3), four (4) and five (5) eleven (11) foot travel lanes where needed. Roadway will be designed as an urban street incorporating context sensitive design principles and include curb and gutter, storm sewers, pedestrian infrastructure, street lighting, street trees. The City of Fort Wayne's Complete Streets (Resolution 103-11-2-16-2) design approach should be utilized on this project. A small structure will also be needed to be extended that crosses the Allen County Roy Delagrange Drain to accommodate the road widening. It is anticipated that additional right-of-way will be needed for this project. All right-of-way engineering will need to be included as part of these engineering services. Land acquisition services will be performed by City of Fort Wayne personnel. It is also anticipated that permitting will need to be completed for the project. The project will be bid through the Board of Public Works.
Design
Roads / Highways
$9,700,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 1, 2023
Coldwater Rd, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: May 12 2022
Fort Wayne, IN
Bid Date: May 05 2022
Fort Wayne, IN
Bid Date: May 05 2022
Fort Wayne, IN
Bid Date: Apr 13 2022
Fort Wayne, IN
Bid Date: May 13 2022
Fort Wayne, IN
Bid Date: Mar 31 2022
Fort Wayne, IN
Bid Date: May 17 2022
Fort Wayne, IN
Bid Date: May 11 2022
Fort Wayne, IN
Bid Date: May 05 2022
Fort Wayne, IN
Bid Date: Apr 28 2022
Fort Wayne, IN
Bid Date: Mar 17 2022
Alley Reconstruction - Margaret Avenue, Greenlawn Avenue, Oakland St and St. Mary's Avenue - 4637809
Fort Wayne, IN
Bid Date: Mar 17 2022
Fort Wayne, IN
Bid Date: Mar 17 2022
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: Feb 24 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.