Published March 25, 2021 at 8:00 PM

Updated October 1, 2024

Site work, paving and new construction of a mixed-use development in Liberty, Kentucky. Completed plans call for the construction of a 8,000-square-foot pre-engineered storage facility; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project is to be a new maintenance garage for the Kentucky Transportation Cabinet, District 8. The building will be an 8,000 square feet pre-engineered metal building with metal wall and roof panels and a thermal insulation/liner system. The structural system consists of a pre-engineered steel frame skeleton with conventional poured in place concrete shallow foundations, piers, grade beams and concrete floor slabs. The building layout consists of a 6,000 sf vehicle area with two vehicle bays, and a 2,000 sf support area containing offices, toilets, shower, break room and storage. Interior partitions will be light gauge steel framing with gypsum board surface and sound batt insulation. Occupied support spaces will have exposed concrete flooring and acoustic panel ceilings. Pedestrian doors will be hollow metal, windows will be aluminum framed with insulating glass. Vehicle doors will be by Owner. Site work consists of excavation and engineered fill for the building pad, minimal sidewalks, and parking and asphalt paving. Site furnishings include signage and flagpole. Water service shall be from municipal system, sanitary will gravity flow to municipal system. The building will utilize natural gas for heat. HVAC for occupied support spaces will be a packaged horizontal HVAC unit. Vehicle bays will be heated with gas unit heaters and ventilated with exhaust fans. Electrical work includes a 120/240V power distribution system and LED lighting. Communications systems will include telephone and data wiring and devices. Estimated Length of Project: 270 (Substantial Completion) + 30 (Final Completion) All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky. The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject any and all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$1,131,407.00

Public - State/Provincial

New Construction, Paving, Site Work

67

52

13

10

Subscribe For Documents

97 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roofing and Siding Panels, Metal Wall Panels
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Panel Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers, Canopies, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers
Division 12 - Furnishings

Division 12 - Furnishings

Casework
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Metal Building Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
32
Bidding Soon
661
All Active Projects
277
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2021

April 2, 2021

img_map_placeholder

1090 Wallace Wilkinson Blvd, Liberty, KY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

KYTC - Casey County Maintenance Garage

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.