Site work, paving and outdoor lighting for a mixed-use development in Andrews Air Force Base, Maryland. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; for paving for a transportation facility; and water / sewer project.

*Contract Award Date: Nov 24, 2021 Contract Award Number: W912DR22C0004 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 118180425 Contractor Awarded Unique Entity ID (SAM): S73XG4AHD717 Contractor Awarded Name: Southern-RC-JV-01, LLC Contractor Awarded Address: Newbern, TN 38059-1171 USA Base and All Options Value (Total Contract Value): $32399160.00 The USACE-Baltimore District has been tasked to solicit for and award construction services for the repair of Taxiway Whiskey Phase IV at JBA. The project consists of construction of the fourth phase of a four phased project replacing the existing deteriorated taxiway without interrupting the airfield mission. The work includes the repair/replacement of existing taxiways pavements, shoulders, drainage, signage, lighting systems, duct banks, paint and markings, re-align taxiways, and temporary taxiways. The project scope also includes excavation, site preparation, striping, restoration of disturbed areas, storm water management features and mitigation measures, construction management services, airfield self-escorting plus all necessary and essential utilities and work to satisfy operation requirements associated with this project to include demolition. The Contractor will be required to prepare at least two or maybe more " mix designs" to identify different sources of "fly ash" to ensure sufficient quantities to complete the project. The awarded Contractor for the construction contract will detail their plan to handle the approval requirements of the concrete mix design. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. Airfield pavements will be designed in accordance with UFC 3-260-01, Airport and Heliport Design, UFC 3-260-2, Pavement Design, and UFC 3-535-01, Visual Air Navigation Facilities. The projected solicitation date for this project is on or about 1 June 2021 and will be solicited as an Invitation for Bid (IFB) with Definitive Responsibility Criteria (DRC). Contracting Officer will examine whether the low bidder can meet the requirements of the solicitation by reviewing at least three (3) completed projects within six (6) years of the original date of the solicitation. Completed projects will include taxiway construction with comparable scope and complexity and have a minimum completion value of $25M that demonstrates runway/taxiway experience of at least ( 4) of the following elements: Airfield Paving (PCC) Airfield Lighting and Signage Installation Airfield Underground Utilities Active Flightline (24/7 operations) High Security Areas Experience working with FAA & Secret Service Self-Escort Support Temporary Taxiway Instrument Landing System (ILS) Ramp Freeze This will be considered definitive responsibility criterion. Bidders are not required to submit additional documentation related to this criterion at the time of bid. The Government will request supporting documents from the bidder anticipated to receive the award.

Award

Transportation Terminals

$32,399,160.00

Public - Federal

Outdoor Lighting, Paving, Site Work

284

18

14

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Gratings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Sheet Waterproofing, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Access Doors and Panels, Entrances and Storefronts, Hardware
Division 09 - Finishes

Division 09 - Finishes

Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Facility Fuel Systems, Facility Fuel Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Special Purpose Lighting, Obstruction Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Rigid Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts, Subdrainage, Drainage Layers
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps, Hooks, Lifts, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
95
Bidding Soon
1,928
All Active Projects
886
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2021

January 18, 2022

img_map_placeholder

To Be Determined, Andrews Air Force Base, MD

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace and Upgrade Taxiway Whiskey Phase IV, at Joint Base Andrews (JBA)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.