BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Beaumont, Texas. Completed plans call for site work for a water / sewer project.

**As of April 23, 2021, this project has been awarded to Shaver Construction & Contracting Services LLC with a total amount o f$549,490.00. Questions are to be submitted using the question and answer process on the procurement Responses to questions posted on the procurement website will be posted for the benefit of all Offerors. A response will be posted for questions submitted until 12:00 p.m. CST on Tuesday, February 9th, 2021. Offerors must submit an acceptable Bid Security with their Bids as a guarantee that the Successful Offeror will enter into a contract for the Project with the Owner within 15 days of Notice of Award of the Contract. The Bid Security must be payable to City of Beaumont in the amount of 5 percent of the proposed Contract Price. The Successful Offeror must execute the Contract and bonds on the forms provided in the Contract Documents and provide evidence of insurance as required by the Contract Documents. It is the intent of the Owner to award this Contract to the lowest responsible Offeror. The Owner reserves the right to adopt the most advantageous interpretation of the Bids submitted in the case of ambiguity or lack of clearness in stating bid prices, to reject any or all Bids, and/or waive formalities. Bids will remain subject to acceptance and may not be withdrawn within 60 days from the date on which Bids are opened A. This project consists of repairing a leaking 72-Inch Concrete Pipe at the location where chemical injection products for the treated water clear well are applied inside a concrete vault. The project includes but it is not limited to: 1. Flushing and cleaning existing clear well with stagnant water to prepare it to receive treated water for sampling and chemical injection. 2. Relocation of 3 injection lines to the discharge of the 48-Inch bypass pipe into the treated water clear well. These lines will be run from the adjacent pipe chase. Open 48-Inch bypass to treated water clear well. 3. Installation of plugs upstream and downstream of 72-Inch water line to empty line in preparation for inspection. Installation requires set up of water leak detection systems to ascertain if water is passing through the plugs. 4. Inspection of 72-Inch water line. Define limits of carbon fiber repair. Set up scaffolding and air supply lines for repair work. 5. If pipe is deemed structurally sound, core 72-Inch pipe at the vault location to install 18-Inch access manway. Install reinforcing concrete and carbon fiber to affix the manway structurally to the pipe and vault assembly. 6. Perform internal pipe repair with carbon fiber in accordance with the limits agreed upon. 7. Provide a replacement sump pump inside the vault with new plumbing and updated sump area. 8. Supply a blind flange fitted with 3 injection threadolets and one sampling pipe threadolet for the proposed 18-Inch access manway. 9. Relocate injection lines and sampling line to new connections inside the vault. Cap and plug temporary injection on the treated water clear well. 10. Remove scaffolding and air supply lines. Remove plugs and close by-pass line. Resume normal operation.

Award

Water / Sewer

$549,490.00

Public - City

Site Work

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
148
Bidding Soon
2,693
All Active Projects
1,096
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.