BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 18, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Fremont, Nebraska. Design plans call for site work for a transportation facility; for paving for a transportation facility; sidewalk / parking lot; and sidewalk / parking lot.

As of May 18, 2023, this project is in the design phase. The board approved to present the Airport’s Capital Improvement Plan (CIP) to the City of Fremont Council of moving the Airport Layout Plan to 2024 from 2026. Further information regarding design and construction has not been identified. A detailed scope has not been released. Plans call for reconstruction portion of the runway and a portion of a connecting taxiway. The airport’s runway needs to have approximately 1,700 feet of the 5,400-foot pavement replaced. The project, which is still in the design phase, will involve tearing out concrete and replacing it.

Design

Transportation Terminals

$7,300,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
90
Bidding Soon
965
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2023

Project location map

1203 W 23rd St, Fremont, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.