Site work and paving for a mixed-use development in Greer, South Carolina. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

As of March 12, 2021, bids are still under review for this project. Bid Results are not yet available. Project work includes: Project consists of mill and overlay of asphalt shoulders of Taxiway A, B, J, K, and a portion of L, mill and overlay a portion of asphalt Taxiway L, mill and overlay asphalt Taxiways D and G, full-depth replacement of a portion Taxiway L5 (concrete and asphalt pavement) and Taxiway L6 (concrete pavement), excavation, filling/grading, and transport of material to/from the project site, underground utility installation and relocation, drainage improvements, re-vegetation and erosion control. Email teleconference link requests to Justin Gobbel -- justin.gobbel@kimley-horn.com -- RE: GSP Airfield Pavement Improvements Program -- Priority 1. Contractor may request a tour of the project site. Email site tour requests to Justin Gobbel -- justin.gobbelkimley-horn.com -- RE: GSP Airfield Pavement Improvements Program -- Priority 1. 5) Contractor Qualifications: All Bidders Shall Submit Evidence of Competency and Evidence of Financial Responsibility With Their Bid. Failure to Provide This Documentation May Be Grounds for Determining the Bid Non-responsive. 6) Federal Requirements: All Bidders Are Responsible for Compliance With Federal Requirements for Preparation and Submission of the Proposal. The Successful Bidder Shall Be Responsible for Compliance With Federal Requirements in the Contract Agreement. 7) Disadvantaged Business Enterprise (Dbe): Title 49 Cfr Part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation Programs, Applies to This Contract. The Owner Has Set a DBE Participation Goal of 7.7% of the Dollar Value of This Contract. 8) Licensing: Each Bid Must Be by a Contractor Properly Licensed in the State of South Carolina. The Bidders Shall Certify, by Submission of a Proposal, That Neither It Nor Its Principals Is Presently Debarred, Suspended, Proposed for Debarment, Declared Ineligible, or Voluntarily Excluded From Participating in This Transaction by Any Federal Department or Agency or the State of South Carolina. 9) Bid Guaranty and Contract Bonds: a Bid Guaranty Made Payable to the Greenville-spartanburg Airport District in the Form of Either a Certified or Cashier's Check or in the Form of a Bid Bond for No Less Than 5% of the Total Bid Is Required With Each Bid. The Successful Bidder Shall Execute a Performance Bond and a Payment Bond, Each in the Amount of 100% of the Contract Price. 10) Award: No Bidder May Withdraw an Opened Bid for a Period of 90 Days Following the Bid Opening Without Greenville-spartanburg Airport District's Consent. Award for the Project Will Be Made to the Lowest Responsible Qualified Bidder, if Awarded. The Owner Reserves the Right to Reject Any or All Bids and to Waive Any Informalities, Technicalities or Omissions Therein. See Instructions to Bidders for Further Airfield Pavement Improvements Program -- Priority 1 January 20, 2021 Greenville-spartanburg International Airport Ntb-1 Issued for Bid

Post-Bid

Transportation Terminals

$2,000,000.00

Public - County

Paving, Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Flags and Banners, Flags
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Commercial Equipment, Mercantile and Service Equipment, Healthcare Equipment, Examination and Treatment Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Soil Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Storm Drainage Utilities, Culverts, Pipe Culverts, Concrete Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Manufacturing Equipment, Dies and Molds, Molds, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
48
Bidding Soon
998
All Active Projects
424
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Airfield Pavement Improvements Program - Priority 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.